OSHA SearchOSHA records by employer

New Start Development, LLC: OSHA inspections and violations

Raleigh, North Carolina · New Single-Family Housing Construction (except For-Sale Builders) · NAICS 236115

1inspections
4citation items
$1,500current penalties
Apr 14, 2016last inspection

OSHA has inspected New Start Development, LLC once in North Carolina.

The inspection began on Apr 14, 2016 as a planned inspection, in Raleigh.

That inspection ended with 4 citation items: 4 serious.

Penalties were first proposed at $1,500 and still stand at $1,500.

Rules for each type of scaffold comes up most often in these citations: 3 items under 1926.452.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and New Start Development, LLC averages $1,500 (1 cited inspection).

New Start Development, LLC: OSHA citation items per year, 2016 to 2016
Citation items per year, by inspection date.

North Carolina · latest 90 days of OSHA records

236employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in North Carolina: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in North Carolina

Checking a subcontractor, a client or your own company? Watch New Start Development, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341399715 OPENED APR 14, 2016Closed

Planned · Complete · Safety · 1 employee at the site · Closed Aug 4, 2017

1946 Bernard St., Raleigh, NC 27608 · New Single-Family Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.452(j)(1) · Rules for each type of scaffold
Serious$1,500$1,500Apr 28, 2016Final
Citation 1, item 1b
29 CFR 1926.452(j)(2) · Rules for each type of scaffold
Serious$0$0Apr 28, 2016Final
Citation 1, item 1c
29 CFR 1926.452(j)(7) · Rules for each type of scaffold
Serious$0$0Apr 28, 2016Final
Citation 1, item 1d
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$0$0Apr 28, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(g)(4)(i)

(i) Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.452(j)(1)

(j) Pump jack scaffolds. (1) Pump jack brackets, braces, and accessories shall be fabricated from metal plates and angles. Each pump jack bracket shall have two positive gripping mechanisms to prevent any failure or slippage.

29 CFR 1926.452(j)(2)

(2) Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled.

Other new single-family housing construction (except for-sale builders) employers in North Carolina

Alert subscribers get notified of each newly cited employer in North Carolina the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.