OSHA SearchOSHA records by employer

Nicol Construction, LLC.: OSHA inspections and violations

Washington, District of Columbia · New Multifamily Housing Construction (except For-Sale Builders) · NAICS 236116

3inspections
9citation items
$6,900current penalties
Dec 16, 2021last inspection

Nicol Construction, LLC. has 3 OSHA inspections on record in District of Columbia, the first in 2016.

OSHA's last visit started on Dec 16, 2021 as a planned inspection, in Washington.

Across those inspections OSHA issued 9 citation items: 9 serious.

OSHA proposed $9,594 in penalties. After settlements and reviews the total is $6,900, down 28%.

Most often, OSHA cited 1926.451, scaffolds, general requirements (4 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Nicol Construction, LLC. averages $3,450 over 2 cited inspections in that time.

Nicol Construction, LLC.: OSHA citation items per year, 2016 to 2021
Citation items per year, by inspection date.

District of Columbia · latest 90 days of OSHA records

14employers cited

Get notified the morning OSHA posts each new citation in District of Columbia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in District of Columbia

Checking a subcontractor, a client or your own company? Watch Nicol Construction, LLC. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345691547 OPENED DEC 16, 2021Closed

Planned · Complete · Safety · 7 employees at the site · Closed Aug 16, 2022

1026 18th Street, Ne, Washington, DC 20002 · Residential Remodelers · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.403(d)(1) · Electrical equipment on job sites
Serious$1,678$900May 25, 2022Final
Citation 1, item 1b
29 CFR 1926.405(b)(1) · Job-site wiring
Serious$0$0May 25, 2022Final
Citation 1, item 2
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$3,916$2,000May 25, 2022Final

Inspection 342531506 OPENED AUG 8, 2017Closed

Planned · Partial · Safety · 7 employees at the site · Closed Sep 1, 2017

1301 H Street, Ne, Washington, DC 20002 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341586154 OPENED MAY 18, 2016Closed

Planned · Complete · Safety · 7 employees at the site · Closed Nov 15, 2016

1012 Harvard St., Nw, Washington, DC 20005 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.405(b)(2) · Job-site wiring
Serious$1,600$1,600Aug 1, 2016Final
Citation 1, item 1b
29 CFR 1926.405(b)(3)(i) · Job-site wiring
Serious$0$0Aug 1, 2016Final
Citation 1, item 2a
29 CFR 1926.451(a)(1) · Scaffolds, general requirements
Serious$2,400$2,400Aug 1, 2016Final
Citation 1, item 2b
29 CFR 1926.451(b)(1)(i) · Scaffolds, general requirements
Serious$0$0Aug 1, 2016Final
Citation 1, item 2c
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$0$0Aug 1, 2016Final
Citation 1, item 2d
29 CFR 1926.451(h)(2) · Scaffolds, general requirements
Serious$0$0Aug 1, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(d)(1)

(d) Mounting and cooling of equipment—(1) Mounting. Electric equipment shall be firmly secured to the surface on which it is mounted. Wooden plugs driven into holes in masonry, concrete, plaster, or similar materials shall not be used.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(b)(1)

(b) Cabinets, boxes, and fittings—(1) Conductors entering boxes, cabinets, or fittings. Conductors entering boxes, cabinets, or fittings shall be protected from abrasion, and openings through which conductors enter shall be effectively closed. Unused openings in cabinets, boxes, and fittings shall also be effectively closed.

29 CFR 1926.405(b)(2)

(2) Covers and canopies. All pull boxes, junction boxes, and fittings shall be provided with covers. If metal covers are used, they shall be grounded. In energized installations each outlet box shall have a cover, faceplate, or fixture canopy. Covers of outlet boxes having holes through which flexible cord pendants pass shall be provided with bushings designed for the purpose or shall have smooth, well-rounded surfaces on which the cords may bear.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.501 · Fall protection in construction

Other new multifamily housing construction (except for-sale builders) employers in District of Columbia

Alert subscribers get notified of each newly cited employer in District of Columbia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.