OSHA SearchOSHA records by employer

Nony Construction LLC: OSHA inspections and violations

Commercial Point, Ohio · Siding Contractors · NAICS 238170

1inspections
3citation items
$4,256current penalties
Apr 22, 2025last inspection

Nony Construction LLC has one OSHA inspection on record in Ohio.

OSHA opened it on Apr 22, 2025 as a planned inspection, in Commercial Point, and the case has not closed yet.

From that inspection OSHA issued 3 citation items: 3 serious.

OSHA proposed $8,512 in penalties. After settlements and reviews the total is $4,256, down 50%.

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Nony Construction LLC averages $4,256 over 1 cited inspection in that time.

Nony Construction LLC: OSHA citation items per year, 2025 to 2025
Citation items per year, by inspection date.

Ohio · latest 90 days of OSHA records

273employers cited

5 of them in the same industry

Get notified the morning OSHA posts each new citation in Ohio: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Ohio

Checking a subcontractor, a client or your own company? Watch Nony Construction LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348194770 OPENED APR 22, 2025Open

Planned · Partial · Safety · 3 employees at the site · Open

420 Cherry Hills Rd, Lot# 244, Commercial Point, OH 43116 · Siding Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(f)(7) · Scaffolds, general requirements
Serious$3,547$1,774Jun 10, 2025Final
Citation 1, item 1b
29 CFR 1926.452(j)(2) · Rules for each type of scaffold
Serious$0$0Jun 10, 2025Final
Citation 1, item 2
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$4,965$2,482Jun 10, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(f)(7)

(7) Scaffolds shall be erected, moved, dismantled, or altered only under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration. Such activities shall be performed only by experienced and trained employees selected for such work by the competent person.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.452(j)(2)

(2) Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled.

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.501(b)(13)

(13) Residential construction. Each employee engaged in residential construction activities 6 feet (1.8 m) or more above lower levels shall be protected by guardrail systems, safety net system, or personal fall arrest system unless another provision in paragraph (b) of this section provides for an alternative fall protection measure. Exception: When the employer can demonstrate that it is infeasible or creates a greater hazard to use these systems, the employer shall develop and implement a fall protection plan which meets the requirements of paragraph (k) of § 1926.502.

Other siding contractors employers in Ohio

Alert subscribers get notified of each newly cited employer in Ohio the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.