OSHA SearchOSHA records by employer

Northface Drywall LLC.: OSHA inspections and violations

Bend, Oregon · Drywall and Insulation Contractors · NAICS 238310

1inspections
2citation items
$1,214current penalties
May 28, 2026last inspection

OSHA inspectors have visited Northface Drywall LLC. in Oregon one time.

It opened on May 28, 2026 as a planned inspection, in Bend.

In all, OSHA issued 2 citation items: 1 serious and 1 other-than-serious.

The penalties, $1,214 in total, stand where OSHA first set them.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Northface Drywall LLC. averages $1,214 across 1 cited inspection.

Northface Drywall LLC.: OSHA citation items per year, 2026 to 2026
Citation items per year, by inspection date.

Oregon · latest 90 days of OSHA records

388employers cited

4 of them in the same industry

Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oregon

Checking a subcontractor, a client or your own company? Watch Northface Drywall LLC. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348963018 OPENED MAY 28, 2026Closed

Planned · Partial · Safety · 10 employees at the site · Closed Oct 28, 2026

21105 Se Archer Dr, Bend, OR 97702 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.300(b)(2) · Tools—Hand and Power: general requirements
Serious$1,214$1,214Sep 3, 2026Final
Citation 2, item 2
29 CFR 1926.405(b)(2) · Job-site wiring
Other-than-serious$0$0Sep 3, 2026Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.300 · Tools—Hand and Power: general requirements

29 CFR 1926.300(b)(2)

(2) Belts, gears, shafts, pulleys, sprockets, spindles, drums, fly wheels, chains, or other reciprocating, rotating or moving parts of equipment shall be guarded if such parts are exposed to contact by employees or otherwise create a hazard. Guarding shall meet the requirements as set forth in American National Standards Institute, B15.1-1953 (R1958), Safety Code for Mechanical Power-Transmission Apparatus.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(b)(2)

(2) Covers and canopies. All pull boxes, junction boxes, and fittings shall be provided with covers. If metal covers are used, they shall be grounded. In energized installations each outlet box shall have a cover, faceplate, or fixture canopy. Covers of outlet boxes having holes through which flexible cord pendants pass shall be provided with bushings designed for the purpose or shall have smooth, well-rounded surfaces on which the cords may bear.

Other drywall and insulation contractors employers in Oregon

Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.