Since 2006, OSHA inspectors have visited NPK Construction Equipment Inc. in Ohio 8 times.
The most recent inspection opened on Sep 17, 2026 on a referral, in Walton Hills and is still open.
In all, OSHA issued 19 citation items: 16 serious and 3 other-than-serious.
The proposed penalties came to $45,123; today they stand at $19,143, 58% less.
The rule cited most here is 1910.212 (machine guarding), 6 times.
Among manufacturing employers, the typical cited inspection since 2015 ends with a $3,600 penalty. NPK Construction Equipment Inc. averages $15,678 across 1 cited inspection.
NPK Construction Equipment Inc. also files yearly injury logs with OSHA, summarized below.
It reported 2 severe injuries to OSHA since 2015.
Citation items per year, by inspection date.
Ohio · latest 90 days of OSHA records
263employers cited
2 of them in the same industry
Get notified the morning OSHA posts each new citation in Ohio: the employer, the site address, the rules broken and the penalty.
Checking a subcontractor, a client or your own company? Watch NPK Construction Equipment Inc. and get notified the morning OSHA posts a new citation for it.
Referral · Partial · Safety · 126 employees at the site · Open
7515 Northfield Rd., Walton Hills, OH 44146 · Construction and Mining (except Oil Well) Machinery and Equipment Merchant Wholesalers · OSHA's record · Phone and website on Google Maps
No citations from this inspection so far.
Inspection 347144180 OPENED DEC 5, 2023Closed
Referral · Partial · Safety · 125 employees at the site · Closed Jul 16, 2024
7515 Northfield Rd., Walton Hills, OH 44146 · Construction and Mining (except Oil Well) Machinery and Equipment Merchant Wholesalers · OSHA's record · Phone and website on Google Maps
Referral · Partial · Safety · 120 employees at the site · Closed Nov 23, 2020
7515 Northfield Road, Walton Hills, OH 44146 · Construction and Mining (except Oil Well) Machinery and Equipment Merchant Wholesalers · OSHA's record · Phone and website on Google Maps
Incident on Oct 13, 2020: Employee amputates two toes when steel plate falls on foot
At 2:30 p.m. on October 13, 2020, an employee was placing steel plates onto stands. A large metal plate was not centered on the stand and fell over onto the employee's foot. The employee suffered the amputation of two toes and was treated without hospitalization.
No citations from this inspection.
Inspection 339808438 OPENED JUN 16, 2014Closed
Planned · No inspection · Safety · 40 employees at the site · Closed Jun 16, 2014
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2025, the Walton Hills site logged 2 recordable injuries or illnesses among about 122 workers: 0.0 per 100 full-time workers, against a median of 1.4 for its industry.
Site and year
Workers
Cases
Days-away cases
Rate
Industry median
NPK Construction Equipment
Walton Hills · 2025
122
2
0
0.0
1.4
NPK Construction Equipment, Inc.
Walton Hills · 2023
117
3
1
2.6
1.4
Included with any plan: 2 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.
An employee was placing a steel plate back into a rack using a 10-ton overhead crane and a plate clamp. The plate fell, hitting the employee's left foot and amputating the big toe as well as part of the second toe.
An employee was manually lifting/flipping a large steel plate when he slipped on some grinding dust and lost his footing. The steel plate, which measured approximately 25" X 28" X 2.5" fell, crushing the employee's right hand. He sustained amputations to his index and middle fingers and was hospitalized.
The rules behind these citations
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1910.110 · Storage and handling of liquefied petroleum gases
29 CFR 1910.110(e)(4)(iii)
(iii) Permanent and removable fuel containers shall be securely mounted to prevent jarring loose, slipping, or rotating, and the fastenings shall be designed and constructed to withstand static loading in any direction equal to twice the weight of the tank and attachments when filled with fuel using a safety factor of not less than four based on the ultimate strength of the material to be used. Field welding, when necessary, shall be made only on saddle plates, lugs or brackets, originally attached to the container by the tank manufacturer.
(4) Energy control procedure. (i) Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section.
29 CFR 1910.147(c)(6)(i)
(6) Periodic inspection. (i) The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed.
Alert subscribers get notified of each newly cited employer in Ohio the morning it is posted. See the alert plans.