OSHA SearchOSHA records by employer

Par-10 Companies: OSHA inspections and violations

Minneapolis, Minnesota · Site Preparation Contractors · NAICS 238910

2inspections
15citation items
$10,450current penalties
Mar 31, 2026last inspection

Par-10 Companies has 2 OSHA inspections on record in Minnesota, the first in 2018.

OSHA's last visit started on Mar 31, 2026 as a planned inspection, in Burnsville.

Across those inspections OSHA issued 15 citation items: 13 serious and 2 other-than-serious.

OSHA proposed $10,450 in penalties and the amount has not been reduced.

Most often, OSHA cited 1926.451, scaffolds, general requirements (7 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Par-10 Companies averages $5,225 over 2 cited inspections in that time.

Par-10 Companies: OSHA citation items per year, 2018 to 2026
Citation items per year, by inspection date.

Minnesota · latest 90 days of OSHA records

371employers cited

Get notified the morning OSHA posts each new citation in Minnesota: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Minnesota

Checking a subcontractor, a client or your own company? Watch Par-10 Companies and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348845702 OPENED MAR 31, 2026Closed

Planned · Complete · Safety · 2 employees at the site · Closed Jul 7, 2026

12901 Aldrich Ave S, Burnsville, MN 55337 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 182.653(08)
Serious$150$150May 6, 2026Final
Citation 1, item 2
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$900$900May 6, 2026Final
Citation 1, item 3
29 CFR 1926.451(c)(2) · Scaffolds, general requirements
Serious$900$900May 6, 2026Final
Citation 1, item 4
29 CFR 1926.451(c)(3) · Scaffolds, general requirements
Serious$900$900May 6, 2026Final
Citation 1, item 5
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$750$750May 6, 2026Final
Citation 1, item 6
29 CFR 1926.451(f)(3) · Scaffolds, general requirements
Serious$900$900May 6, 2026Final
Citation 1, item 7
29 CFR 1926.451(f)(7) · Scaffolds, general requirements
Serious$900$900May 6, 2026Final
Citation 1, item 8
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$900$900May 6, 2026Final
Citation 1, item 9
29 CFR 1926.454(b) · Scaffold training
Serious$900$900May 6, 2026Final

Inspection 343496162 OPENED SEP 26, 2018Closed

Planned · Complete · Safety · 5 employees at the site · Closed Dec 6, 2018

3207 Lake Street, Minneapolis, MN 55406 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.134(a)(2) · Respiratory protection
Serious$625$625Oct 8, 2018Final
Citation 1, item 2
29 CFR 1910.1200(h)(1) · Hazard communication
Serious$750$750Oct 8, 2018Final
Citation 1, item 3
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$875$875Oct 8, 2018Final
Citation 1, item 4
29 CFR 1926.503(a)(1) · Fall protection training in construction
Serious$875$875Oct 8, 2018Final
Citation 2, item 1
29 CFR 1926.501(b)(4)(ii) · Fall protection in construction
Other-than-serious$125$125Oct 8, 2018Final
Citation 2, item 2
29 CFR 1910.1200(e)(1) · Hazard communication
Other-than-serious$0$0Oct 8, 2018Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1910.1200(h)(1)

(h) Employee information and training. (1) Employers shall provide employees with effective information and training on hazardous chemicals in their work area at the time of their initial assignment, and whenever a new chemical hazard the employees have not previously been trained about is introduced into their work area. Information and training may be designed to cover categories of hazards (e.g., flammability, carcinogenicity) or specific chemicals. Chemical-specific information must always be available through labels and safety data sheets.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(a)(2)

(2) The CNP system defaults selected for test pressure shall be set at −15 mm of water (-0.58 inches of water) and the modeled inspiratory flow rate shall be 53.8 liters per minute for performing fit tests.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.454 · Scaffold training

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.503 · Fall protection training in construction

Other site preparation contractors employers in Minnesota

Alert subscribers get notified of each newly cited employer in Minnesota the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.