Par Electrical Contractors Inc: OSHA inspections and violations
Lees Summit, Missouri · Electrical Contractors and Other Wiring Installation Contractors · NAICS 238210
14inspections
30citation items
$137,288current penalties
Jan 18, 2023last inspection
OSHA has inspected Par Electrical Contractors Inc 14 times in Missouri since 1973.
The latest one began on Jan 18, 2023 on a referral, in Kansas City.
Those inspections ended with 30 citation items: 10 serious, 1 repeat and 19 other-than-serious.
Penalties were first proposed at $139,256 and now stand at $137,288, 1% lower after settlements or reviews.
Electric Power Transmission and Distribution: general comes up most often in these citations: 6 items under 1926.950.
How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Par Electrical Contractors Inc averages $34,795 (2 cited inspections).
4 inspections on this page followed a fatal incident.
Par Electrical Contractors Inc also files yearly injury logs with OSHA, summarized below.
It reported 1 severe injury to OSHA since 2015.
The Wage and Hour Division has 1 case on it since 2015, with $0 in back wages owed to workers.
Citation items per year, by inspection date.
Missouri · latest 90 days of OSHA records
126employers cited
Get notified the morning OSHA posts each new citation in Missouri: the employer, the site address, the rules broken and the penalty.
Checking a subcontractor, a client or your own company? Watch Par Electrical Contractors Inc and get notified the morning OSHA posts a new citation for it.
Incident on Jul 3, 2019: Two employees are injured by contact with electrical current
At 10:45 a.m. on July 3, 2019, Employees #1 and #2, employed by an electrical contractor, were moving a service line higher up an existing utility pole. They were working from a bucket truck when the service line came into contact with another utility's energized power lines. Both employees were shocked and burned by the high voltage. They were transported to the hospital and admitted for treatment of electric shock and electrical burns.
Incident on Jan 23, 2007: Four employees shocked when power lines make contact
On January 23, 2007, Employees #1 through #4 were restringing and upgrading a 7, 200-volt distribution line. In the process, the crew pulled the line up and into the existing 69-kilovolt line. All four workers suffered severe electric shocks , sustaining injuries that required hospitalization.
Incident on Apr 19, 1999 (fatal): Electric shock - direct contact with overhead line
Two power line workers were working from the bucket of an aerial lift, tying a n ew overhead power line to insulators on top of a new utility pole. An existing 1 2.47-kilovolt (7200 volts phase-to-ground) overhead power line was supported fro m the pole by hot arms. The employees had not covered the existing line with ele ctrical protective equipment even though they were working near it. Additionally , the employees were not wearing any electrical protective equipment; they were, at best, only wearing leather gloves. The insulator for the new line conductor was 667 millimeters from the energized line. The front of the aerial lift bucket was facing east, and the existing line was behind the bucket. As the employees were lifting the new line conductor onto the outside insulator on the west side of the pole, the employee on the south side of the bucket contacted an energized part with his left palm. He was electrocuted. (The employee had an exit wound o n the back of his left thigh.) The employee on the ground quickly jumped onto th e back of the truck to lower the bucket using the lower controls. When he did th is, the hydraulic lines burst causing a fire at the bucket. The second employee in the bucket jumped to the ground after attempts to douse the fire by the emplo yee on the ground had failed. The second employee in the bucket was hospitalized with burns to his back.
Incident on Feb 14, 1994 (fatal): Electric shock - direct contact with overhead line
Two power line workers were removing hardware from a utility pole. They were in an insulated aerial lift, removing a bolt at the top of the pole. The guy for th e pole was attached to this bolt. One of the employees climbed out of the bucket and onto the crossarm. Using a hammer and a screwdriver, he punched the bolt un til he could pull it out by hand. His coworker stayed in the bucket, holding the guy. When the employee on the pole pulled the bolt free, either the guy or his hand contacted an energized jumper. He received an electric shock, and his cloth ing ignited from the resultant electric arc. The employee in the aerial lift mov ed the bucket, removed the injured employee from the pole, and lowered him to th e ground. The employee on the pole was airlifted to a hospital, where he died of his injuries 2 days later. The employee in the aerial lift sustained third-degr ee burns on his left wrist during the rescue.
Incident on Mar 4, 1991 (fatal): Burn - electrical fault in recloser
TWO POWER LINE WORKERS (ONE OF WHOM WAS A FOREMAN) WENT TO A SUBSTATION WITH ORD ERS TO OPEN AN OIL CIRCUIT RECLOSER. THE RECLOSER WAS SITUATED NEAR THE TOP OF A POLE AND HAD A REMOTE SWITCH BOX LOCATED CLOSER TO THE GROUND. WHILE THE FOREMA N WAITED ON THE GROUND, THE OTHER POWER LINE WORKER WENT UP ABOUT 10 FEET IN AN AERIAL LIFT AND THREW THE REMOTE SWITCH. THE RECLOSER RUPTURED, SPRAYING BURNING INSULATING OIL ON THE EMPLOYEE IN THE BUCKET. HE DIED A SHORT TIME LATER.
No citations from this inspection.
Inspection 106639453 OPENED FEB 7, 1991Closed
Accident · Complete · Safety · 17 employees at the site · Closed Jun 12, 1991
Incident on Jan 14, 1991 (fatal): Electric shock - cause unknown
A five-person power line crew was replacing a utility pole. The crew had removed the old pole from an H structure and was setting the new pole. The new pole was attached to a pole-setting truck by a sling. Two of the employees were guiding the butt end of the pole as it was being raised up between two phases of a 161-k ilovolt, three-phase delta overhead power line. Although the line had been deene rgized, voltage was apparently still present. The two employees were guiding the pole so it would not come within 1 meter of either phase conductor and to assis t in setting the pole. One of the employees guiding the pole was electrocuted; h owever, the original abstract did not describe how.
From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.
In 2024, the Kansas City site logged 14 recordable injuries or illnesses among about 893 workers: 1.4 per 100 full-time workers, against a median of 1.0 for its industry. Those cases cost 185 days away from work.
Site and year
Workers
Cases
Days-away cases
Rate
Industry median
PAR Electrical Contractors, LLC
Kansas City · 2024
893
14
3
1.4
1.0
PAR Electrical - Central
Kansas City · 2023
490
7
2
1.4
1.0
PAR - C&R - PAR Drilling
Kansas City · 2023
78
2
1
2.1
1.0
PAR Electrical - Corporate
Kansas City · 2023
58
0
0
0.0
1.0
PAR Electrical - Fleet
Kansas City · 2023
34
0
0
0.0
1.0
Division #1
Kansas City · 2022
485
10
5
1.9
1.0
Division #90
Kansas City · 2022
64
0
0
0.0
1.0
Division #70
Kansas City · 2022
27
0
0
0.0
1.0
Included with any plan: 26 more yearly logs from these sites, back to 2016, with each site's average rate over its latest three years. Already a subscriber? Sign in.
(3) How quickly must each injury or illness be recorded? You must enter each recordable injury or illness on the OSHA 300 Log and 301 Incident Report within seven (7) calendar days of receiving information that a recordable injury or illness has occurred.
(4) All firefighting equipment shall be periodically inspected and maintained in operating condition. Defective equipment shall be immediately replaced.
(2) The employer shall instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his work environment to control or eliminate any hazards or other exposure to illness or injury.
Alert subscribers get notified of each newly cited employer in Missouri the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.