OSHA SearchOSHA records by employer

Paragon Corp.: OSHA inspections and violations

Saipan, Northern Mariana Islands · Commercial and Institutional Building Construction · NAICS 236220

3inspections
12citation items
$33,867current penalties
May 15, 2025last inspection

OSHA has inspected Paragon Corp. 3 times in Northern Mariana Islands since 2021.

The latest one began on May 15, 2025 as a planned inspection, in Saipan.

Those inspections ended with 12 citation items: 7 serious, 1 repeat and 4 other-than-serious.

Penalties were first proposed at $42,467 and now stand at $33,867, 20% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 3 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Paragon Corp. averages $11,289 (3 cited inspections).

Paragon Corp.: OSHA citation items per year, 2021 to 2025
Citation items per year, by inspection date.

Want to know if OSHA cites Paragon Corp. again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 348249723 OPENED MAY 15, 2025Closed

Planned · Complete · Safety · 6 employees at the site · Closed Jul 9, 2026

Beach Rd San Jose Oleai, Saipan, MP 96950 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$8,276$8,276Jun 30, 2025Final
Citation 1, item 2
29 CFR 1926.452(a)(4) · Rules for each type of scaffold
Serious$8,276$4,967Jun 30, 2025Final
Citation 2, item 1
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Repeat$16,552$14,069Jun 30, 2025Final
Citation 3, item 1
29 CFR 1910.1200(g)(8) · Hazard communication
Other-than-serious$0$0Jun 30, 2025Final
Citation 3, item 2
29 CFR 1926.403(b)(2) · Electrical equipment on job sites
Other-than-serious$0$0Jun 30, 2025Final
Citation 3, item 3
29 CFR 1926.1052(c)(1)(ii) · Stairways in construction
Other-than-serious$0$0Jun 30, 2025Final

Inspection 345365878 OPENED JUN 17, 2021Closed

Planned · Complete · Health · 6 employees at the site · Closed May 10, 2022

Joeten-kiyu Public Library Susupe, Saipan, MP 96950 · Roofing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.95(a) · Criteria for personal protective equipment
Serious$1,755$1,228Aug 31, 2021Final
Citation 2, item 1
29 CFR 1910.1200(e)(1) · Hazard communication
Other-than-serious$0$0Aug 31, 2021Final

Inspection 345371041 OPENED JUN 17, 2021Closed

Planned · Complete · Safety · 10 employees at the site · Closed Jul 28, 2022

Joeten-kiyu Public Library Susupe, Saipan, MP 96950 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$2,341$1,639Aug 31, 2021Final
Citation 1, item 2
29 CFR 1926.501(b)(10) · Fall protection in construction
Serious$2,926$2,048Aug 31, 2021Final
Citation 1, item 3a
29 CFR 1926.1053(b)(1) · Ladders in construction
Serious$2,341$1,639Aug 31, 2021Final
Citation 1, item 3b
29 CFR 1926.1053(b)(13) · Ladders in construction
Serious$0$0Aug 31, 2021Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1910.1200(g)(8)

(8) The employer shall maintain in the workplace copies of the required safety data sheets for each hazardous chemical, and shall ensure that they are readily accessible during each work shift to employees when they are in their work area(s). (Electronic access and other alternatives to maintaining paper copies of the safety data sheets are permitted as long as no barriers to immediate employee access in each workplace are created by such options.)

29 CFR 1926.1052 · Stairways in construction

29 CFR 1926.1052(c)(1)(ii)

(ii) One stairrail system along each unprotected side or edge.

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.95 · Criteria for personal protective equipment

Other commercial and institutional building construction employers in Northern Mariana Islands

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.