OSHA SearchOSHA records by employer

Parisi Construction, LLC: OSHA inspections and violations

Madison, Wisconsin · Water and Sewer Line and Related Structures Construction · NAICS 237110

11inspections
21citation items
$35,821current penalties
Nov 14, 2023last inspection

OSHA has inspected Parisi Construction, LLC 11 times in Wisconsin since 1993.

The latest one began on Nov 14, 2023 as a planned inspection, in Madison.

Those inspections ended with 21 citation items: 13 serious and 8 other-than-serious.

Penalties were first proposed at $51,290 and now stand at $35,821, 30% lower after settlements or reviews.

Respiratory protection comes up most often in these citations: 4 items under 1926.103.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Parisi Construction, LLC averages $10,583 (2 cited inspections).

Parisi Construction, LLC also files yearly injury logs with OSHA, summarized below.

Parisi Construction, LLC: OSHA citation items per year, 1993 to 2023
Citation items per year, by inspection date.

Wisconsin · latest 90 days of OSHA records

231employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in Wisconsin: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Wisconsin

Checking a subcontractor, a client or your own company? Watch Parisi Construction, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347101719 OPENED NOV 14, 2023Closed

Planned · Partial · Health · 8 employees at the site · Closed May 28, 2024

Intersection Of East Washington Avenue And N Marquette Street, Madison, WI 53704 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.134(e)(1) · Respiratory protection
Other-than-serious$8,816$8,816Apr 26, 2024Final
Citation 1, item 1b
29 CFR 1910.134(f)(2) · Respiratory protection
Other-than-serious$0$0Apr 26, 2024Final
Citation 1, item 1c
29 CFR 1910.134(g)(1)(i)(a) · Respiratory protection
Other-than-serious$0$0Apr 26, 2024Final
Citation 1, item 1d
29 CFR 1926.1153(e)(2) · Silica dust in construction
Other-than-serious$0$0Apr 26, 2024Final
Citation 1, item 2
29 CFR 1926.1153(c)(1) · Silica dust in construction
Other-than-serious$8,816$8,816Apr 26, 2024Final
Citation 2, item 1
29 CFR 1926.1153(g)(3) · Silica dust in construction
Other-than-serious$0$0Apr 26, 2024Final

Inspection 346142169 OPENED AUG 11, 2022Closed

Complaint · Partial · Safety · 15 employees at the site · Closed Oct 28, 2022

1080 Arrowhead Way, Verona, WI 53593 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 345378574 OPENED JUN 23, 2021Closed

Planned · Partial · Safety · 6 employees at the site · Closed Sep 17, 2021

5909 Sharpsburg Drive, Madison, WI 53718 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 343308565 OPENED JUL 18, 2018Closed

Referral · Partial · Safety · 120 employees at the site · Closed Mar 20, 2019

427 Baitinger Court, Sun Prairie, WI 53590 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.651(b)(1) · Excavations
Serious$7,068$3,534Aug 29, 2018Final

Inspection 339813735 OPENED JUN 17, 2014Closed

Planned · Partial · Safety · 70 employees at the site · Closed Oct 9, 2015

Pflaum Road, Madison, WI 53716 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 2
29 CFR 1926.34(c) · Means of egress
Serious$2,310$1,155Aug 25, 2014Final

Inspection 336439781 OPENED SEP 19, 2012Closed

Planned · Partial · Safety · 60 employees at the site · Closed Nov 30, 2012

Corner Of Whitney Way And University Ave, Madison, WI 53705 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.652(b)(2) · Trench protection
Serious$10,780$7,000Nov 2, 2012Final

Inspection 313133266 OPENED APR 26, 2010Closed

Planned · Partial · Safety · 27 employees at the site · Closed Sep 10, 2010

3rd & Main Streets, Watertown, WI 53094 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.652(a)(1) · Trench protection
Serious$2,500$1,500Jul 13, 2010Closed

Inspection 306107533 OPENED AUG 29, 2003Closed

Planned · Partial · Health · 65 employees at the site · Closed Oct 21, 2003

East Broadway, Madison, WI 53716 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

3 older inspections

Inspection 306107061 OPENED AUG 13, 2003Closed

Planned · Partial · Safety · 65 employees at the site · Closed Oct 20, 2003

4802 East Broadway, Madison, WI 53716 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 2
29 CFR 1926.652(b)(2) · Trench protection
Serious$3,000$2,000Sep 2, 2003Closed
Citation 2, item 1 Other-than-serious$0$0Sep 2, 2003Closed

Inspection 303862759 OPENED MAY 15, 2001Closed

Planned · Partial · Health · 55 employees at the site · Closed Oct 28, 2002

University Avenue, Madison, WI 53705 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.28(a) · Personal protective equipment
Serious$3,000$1,000Jun 19, 2001Final
Citation 1, item 2a
29 CFR 1926.55(a) · Gases, vapors, fumes, dusts, and mists
Serious$1,500$500Jun 19, 2001Final
Citation 1, item 2b
29 CFR 1926.55(b) · Gases, vapors, fumes, dusts, and mists
Serious$0$0Jun 19, 2001Final
Citation 1, item 3
29 CFR 1926.59(h) · Hazard communication
Serious$500$500Jun 19, 2001Final
Citation 1, item 4a
29 CFR 1926.103(c)(1) · Respiratory protection
Serious$1,500$500Jun 19, 2001Final
Citation 1, item 4b
29 CFR 1926.103(d)(1)(iii) · Respiratory protection
Serious$0$0Jun 19, 2001Final
Citation 1, item 5a
29 CFR 1926.103(k)(1)(i) · Respiratory protection
Serious$1,500$500Jun 19, 2001Final
Citation 1, item 5b
29 CFR 1926.103(k)(1)(ii) · Respiratory protection
Serious$0$0Jun 19, 2001Final

Inspection 102469822 OPENED JUN 29, 1993Closed

Unprogrammed other · Complete · Safety · 4 employees at the site · Closed Jul 20, 1993

515 22nd Avenue, Monroe, WI 53566 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.301(c) · Hand tools
Other-than-serious$0$0Jul 6, 1993Closed

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2025, the Verona site logged 5 recordable injuries or illnesses among about 142 workers: 3.4 per 100 full-time workers, against a median of 2.2 for its industry. Those cases cost 53 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
Parisi Construction LLC (2)
Verona · 2025
142 553.42.2
Parisi Construction LLC
Verona · 2024
141 848.02.2
Parisi Construction Co., Inc
Verona · 2021
92 537.82.2

Included with any plan: 3 more yearly logs from these sites, back to 2018, with each site's average rate over its latest three years. Already a subscriber? Sign in.

See plans

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(e)(1)

(1) General. The employer shall provide a medical evaluation to determine the employee's ability to use a respirator, before the employee is fit tested or required to use the respirator in the workplace. The employer may discontinue an employee's medical evaluations when the employee is no longer required to use a respirator.

29 CFR 1910.134(f)(2)

(2) Deep breathing. In a normal standing position, the subject shall breathe slowly and deeply, taking caution so as not to hyperventilate.

29 CFR 1910.134(g)(1)(i)(a)

(A) Facial hair that comes between the sealing surface of the facepiece and the face or that interferes with valve function; or

29 CFR 1926.103 · Respiratory protection

29 CFR 1926.1153 · Silica dust in construction

29 CFR 1926.201 · Signaling

29 CFR 1926.28 · Personal protective equipment

29 CFR 1926.301 · Hand tools

29 CFR 1926.34 · Means of egress

29 CFR 1926.55 · Gases, vapors, fumes, dusts, and mists

29 CFR 1926.59 · Hazard communication

29 CFR 1926.651 · Excavations

29 CFR 1926.652 · Trench protection

Other water and sewer line and related structures construction employers in Wisconsin

Alert subscribers get notified of each newly cited employer in Wisconsin the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.