Inspection 349001925 OPENED JUN 16, 2026Open
3401 Hamilton Street, Philadelphia, PA 19104 · Siding Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection so far.
Philadelphia, Pennsylvania · Roofing Contractors · NAICS 238160
OSHA has inspected Pasad LLC 4 times in Pennsylvania since 2019.
The latest one began on Jun 16, 2026 on a referral, in Philadelphia; the case is still open.
Those inspections ended with 4 citation items: 4 serious.
Penalties were first proposed at $11,072 and now stand at $7,525, 32% lower after settlements or reviews.
How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,079, and Pasad LLC averages $3,762 (2 cited inspections).
Want to know if OSHA cites Pasad LLC again? Add it to a watchlist and we will email you the morning the citation shows up.
Watch this company3401 Hamilton Street, Philadelphia, PA 19104 · Siding Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection so far.
1500 South 30th Street, Philadelphia, PA 19146 · Siding Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.451(f)(6) · Scaffolds, general requirements |
Serious | $3,547 | $1,774 | Feb 28, 2025 | Final |
| Citation 1, item 2 29 CFR 1926.452(j)(2) · Rules for each type of scaffold |
Serious | $3,547 | $1,774 | Feb 28, 2025 | Final |
4500 Salmon St, Philadelphia, PA 19137 · Roofing Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
340 North 10th Street, Philadelphia, PA 19107 · Roofing Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1926.501(b)(10) · Fall protection in construction |
Serious | $3,978 | $3,978 | May 29, 2019 | Final |
| Citation 1, item 1b 29 CFR 1926.503(a)(1) · Fall protection training in construction |
Serious | $0 | $0 | May 29, 2019 | Final |
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.451(f)(6)
(6) The clearance between scaffolds and power lines shall be as follows: Scaffolds shall not be erected, used, dismantled, altered, or moved such that they or any conductive material handled on them might come closer to exposed and energized power lines than as follows:
29 CFR 1926.452(j)(2)
(2) Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled.
29 CFR 1926.501(b)(10)
(10) Roofing work on Low-slope roofs. Except as otherwise provided in paragraph (b) of this section, each employee engaged in roofing activities on low-slope roofs, with unprotected sides and edges 6 feet (1.8 m) or more above lower levels shall be protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system. Or, on roofs 50-feet (15.25 m) or less in width (see appendix A to subpart M of this part), the use of a safety monitoring system alone [i.e. without the warning line system] is permitted.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.