OSHA SearchOSHA records by employer

Patricia Kay Watts: OSHA inspections and violations

Ellicott City, Maryland · All Other Specialty Trade Contractors · NAICS 238990

6inspections
23citation items
$20,512current penalties
Nov 21, 2019last inspection

OSHA has inspected Patricia Kay Watts 6 times in Maryland since 2016.

The latest one began on Nov 21, 2019 as a planned inspection, in Fulton; the case is still open.

Those inspections ended with 23 citation items: 14 serious, 3 repeat and 6 other-than-serious.

Penalties were first proposed at $20,512 and still stand at $20,512.

Inspections comes up most often in these citations: 7 items under 1926.1412.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Patricia Kay Watts averages $4,102 (5 cited inspections).

Patricia Kay Watts: OSHA citation items per year, 2016 to 2019
Citation items per year, by inspection date.

Maryland · latest 90 days of OSHA records

185employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in Maryland: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Maryland

Checking a subcontractor, a client or your own company? Watch Patricia Kay Watts and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344477310 OPENED NOV 21, 2019Open

Planned · Complete · Safety · 1 employee at the site · Open

11136 Martha Way, Fulton, MD 20759 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.1404(h)(2) · Assembly/Disassembly—general requirements (applies to all assembly and disassembly operations)
Serious$1,050$1,050Apr 3, 2020Final
Citation 1, item 2
29 CFR 1926.1404(q)(5)(ii) · Assembly/Disassembly—general requirements (applies to all assembly and disassembly operations)
Serious$1,050$1,050Apr 3, 2020Final
Citation 1, item 3
29 CFR 1926.1424(a)(2)(ii) · Work area control
Serious$612$612Apr 3, 2020Final
Citation 1, item 4
29 CFR 1926.1425(c)(2) · Keeping clear of the load
Serious$1,225$1,225Apr 3, 2020Final
Citation 1, item 5 Serious$1,225$1,225Apr 3, 2020Final
Citation 2, item 1 Repeat$2,100$2,100Apr 3, 2020Final
Citation 2, item 2
29 CFR 1926.1412(f)(1) · Inspections
Repeat$2,100$2,100Apr 3, 2020Final

Inspection 343540258 OPENED OCT 17, 2018Closed

Planned · Complete · Safety · 1 employee at the site · Closed May 20, 2019

Lot #2 Crutis Vista Way, Clarksville, MD 21029 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.1412(d)(1) · Inspections
Other-than-serious$0$0Dec 20, 2018Final
Citation 1, item 2
29 CFR 1926.1412(e)(1) · Inspections
Other-than-serious$0$0Dec 20, 2018Final
Citation 1, item 3 Other-than-serious$0$0Dec 20, 2018Final
Citation 1, item 4
29 CFR 1926.1412(f)(1) · Inspections
Other-than-serious$0$0Dec 20, 2018Final

Inspection 343235248 OPENED JUN 13, 2018Open

Planned · Complete · Safety · 2 employees at the site · Open

3332 Burton Drive, Ellicott City, MD 21042 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 09.12.26.06I(1)
Serious$1,000$1,000Aug 7, 2018Final
Citation 1, item 1b
29 CFR 09.12.26.06J
Serious$0$0Aug 7, 2018Final
Citation 2, item 1
29 CFR 09.12.26.06D(1)
Other-than-serious$0$0Aug 7, 2018Final

Inspection 343176590 OPENED MAY 11, 2018Open

Planned · Complete · Safety · 1 employee at the site · Open

217 Glen Willow Way, Ellicott City, MD 21043 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.251(a)(1) · Rigging equipment for material handling
Serious$1,400$1,400Jul 31, 2018Final
Citation 1, item 2
29 CFR 1926.251(a)(2)(i) · Rigging equipment for material handling
Serious$1,400$1,400Jul 31, 2018Final
Citation 1, item 3
29 CFR 1926.251(c)(2) · Rigging equipment for material handling
Serious$800$800Jul 31, 2018Final
Citation 1, item 4
29 CFR 1926.251(c)(4)(iv) · Rigging equipment for material handling
Serious$1,400$1,400Jul 31, 2018Final
Citation 1, item 5
29 CFR 09.12.26.06I(1)
Serious$1,000$1,000Jul 31, 2018Final
Citation 1, item 6
29 CFR 09.12.26.06J
Serious$1,000$1,000Jul 31, 2018Final

Inspection 342693439 OPENED OCT 10, 2017Closed

Unprogrammed other · Complete · Safety · 2 employees at the site · Closed Oct 12, 2017

3506 Timber Green Drive, Urbana, MD 21704 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341304996 OPENED MAR 7, 2016Open

Planned · Complete · Safety · 1 employee at the site · Open

9491 Lyons Mill Road, Owings Mills, MD 21117 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Serious$1,050$1,050Jun 14, 2016Final
Citation 2, item 1
29 CFR 1926.1404(q)(5)(ii) · Assembly/Disassembly—general requirements (applies to all assembly and disassembly operations)
Repeat$2,100$2,100Jun 14, 2016Final
Citation 3, item 1
29 CFR 1926.1413(b)(4) · Wire rope—inspection
Other-than-serious$0$0Jun 14, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1404 · Assembly/Disassembly—general requirements (applies to all assembly and disassembly operations)

29 CFR 1926.1404(h)(2)

(2) Blocking material. The size, amount, condition and method of stacking the blocking must be sufficient to sustain the loads and maintain stability.

29 CFR 1926.1404(q)(5)(ii)

(ii) Be placed only under the outrigger or stabilizer float/pad of the jack or, where the outrigger or stabilizer is designed without a jack, under the outer bearing surface of the extended outrigger or stabilizer beam.

29 CFR 1926.1412 · Inspections

29 CFR 1926.1412(d)(1)

(d) Each shift. (1) A competent person must begin a visual inspection prior to each shift the equipment will be used, which must be completed before or during that shift. The inspection must consist of observation for apparent deficiencies. Taking apart equipment components and booming down is not required as part of this inspection unless the results of the visual inspection or trial operation indicate that further investigation necessitating taking apart equipment components or booming down is needed. Determinations made in conducting the inspection must be reassessed in light of observations made during operation. At a minimum the inspection must include all of the following:

29 CFR 1926.1413 · Wire rope—inspection

29 CFR 1926.1417 · Operation

29 CFR 1926.1424 · Work area control

29 CFR 1926.1425 · Keeping clear of the load

29 CFR 1926.251 · Rigging equipment for material handling

Other all other specialty trade contractors employers in Maryland

Alert subscribers get notified of each newly cited employer in Maryland the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.