OSHA SearchOSHA records by employer

Patriot Ready Mixed Concrete, LLC: OSHA inspections and violations

Jackson, Georgia · Ready-Mix Concrete Manufacturing · NAICS 327320

1inspections
2citation items
$6,211current penalties
Jan 12, 2017last inspection

OSHA inspectors have visited Patriot Ready Mixed Concrete, LLC in Georgia one time.

It opened on Jan 12, 2017 on a referral, in Jackson.

In all, OSHA issued 2 citation items: 2 serious.

The proposed penalties came to $8,873; today they stand at $6,211, 30% less.

The rule cited most here is 1910.147 (lockout/tagout), 2 times.

Among manufacturing employers, the typical cited inspection since 2015 ends with a $4,500 penalty. Patriot Ready Mixed Concrete, LLC averages $6,211 across 1 cited inspection.

Patriot Ready Mixed Concrete, LLC: OSHA citation items per year, 2017 to 2017
Citation items per year, by inspection date.

Georgia · latest 90 days of OSHA records

157employers cited

Get notified the morning OSHA posts each new citation in Georgia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Georgia

Checking a subcontractor, a client or your own company? Watch Patriot Ready Mixed Concrete, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342034865 OPENED JAN 12, 2017Closed

Referral · Partial · Safety · 12 employees at the site · Closed Mar 6, 2017

200 Jackson Rd, Jackson, GA 30233 · Ready-Mix Concrete Manufacturing · OSHA's record · Phone and website on Google Maps

Incident on Jan 10, 2017: Employee's legs are caught by hopper clamps and is injured

At approximately 2:00 p.m. on January 10, 2017, Employee #1 and a coworker were inside a sand hopper. They were attempting to break up frozen sand to prepare the hopper machine for manufacturing concrete. As Employee #1 was working, two clamps on the hopper closed and caught both of his legs. He received unspecified injuries. Employee #1 was transported to a medical center, where he received treatment and was hospitalized.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$8,873$6,211Feb 17, 2017Final
Citation 1, item 1b
29 CFR 1910.147(c)(7)(i) · Lockout/tagout
Serious$0$0Feb 17, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(4)(i)

(4) Energy control procedure. (i) Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section.

29 CFR 1910.147(c)(7)(i)

(7) Training and communication. (i) The employer shall provide training to ensure that the purpose and function of the energy control program are understood by employees and that the knowledge and skills required for the safe application, usage, and removal of the energy controls are acquired by employees. The training shall include the following:

Other ready-mix concrete manufacturing employers in Georgia

Alert subscribers get notified of each newly cited employer in Georgia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.