OSHA SearchOSHA records by employer

Peck & Hiller Company: OSHA inspections and violations

Redwood City, California · Poured Concrete Foundation and Structure Contractors · NAICS 238110

23inspections
15citation items
$10,884current penalties
Mar 8, 2022last inspection

OSHA has inspected Peck & Hiller Company 23 times in California since 1988.

The latest one began on Mar 8, 2022 as a planned inspection, in Vallejo.

Those inspections ended with 15 citation items: 3 serious and 12 other-than-serious.

Penalties were first proposed at $18,435 and now stand at $10,884, 41% lower after settlements or reviews.

Scope, application and definitions applicable to this subpart comes up most often in these citations: 2 items under 1926.450.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Peck & Hiller Company averages $9,450 (1 cited inspection).

Peck & Hiller Company: OSHA citation items per year, 1988 to 2022
Citation items per year, by inspection date.

California · latest 90 days of OSHA records

1,130employers cited

11 of them in the same industry

Get notified the morning OSHA posts each new citation in California: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in California

Checking a subcontractor, a client or your own company? Watch Peck & Hiller Company and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345833727 OPENED MAR 8, 2022Closed

Planned · Partial · Safety · 150 employees at the site · Closed May 15, 2023

2118 Sacramento St., Vallejo, CA 94590 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1509(A)
Other-than-serious$450$450Aug 26, 2022Final
Citation 2, item 1
29 CFR 1624(A)
Serious$4,500$4,500Aug 26, 2022Final
Citation 3, item 1
29 CFR 1712(C)(1)
Serious$4,500$4,500Aug 26, 2022Final

Inspection 315778092 OPENED AUG 26, 2014Closed

Referral · Partial · Health · 8 employees at the site · Closed Sep 10, 2014

900 Middlefield Road, Redwood City, CA 94063 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 314991415 OPENED MAY 2, 2011Closed

Unprogrammed related · Partial · Health · 2 employees at the site · Closed Aug 10, 2011

530 S. Bert Crane Rd., Atwater, CA 95301 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 310099742 OPENED APR 28, 2011Closed

Accident · Partial · Safety · 2 employees at the site · Closed Aug 6, 2012

1450 Terra Nova Blvd., Pacifica, CA 94044 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Incident on Feb 23, 2011: Employee is injured when hit in leg by pry bar

On February 23, 2011, Employee # 1 sustained a laceration on his leg, when a cow orker dropped a stripping bar approximately 15 feet while lowering the tool to g round level. The bar struck sections of the scaffold, bounced and then struck Em ployee # 1. Employee # 1 was not hospitalized.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 3273 F
Other-than-serious$650$160Jul 5, 2011Final

Inspection 312759038 OPENED DEC 12, 2008Closed

Unprogrammed related · Partial · Safety · 26 employees at the site · Closed Aug 10, 2009

2390 Moorpark Ave., San Jose, CA 95128 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 310549027 OPENED NOV 20, 2007Closed

Accident · Partial · Safety · 200 employees at the site · Closed Jan 21, 2009

100 N. First Street, Patterson, CA 95363 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 307394569 OPENED FEB 6, 2006Closed

Accident · Partial · Safety · 112 employees at the site · Closed Nov 9, 2007

170 King Street, San Francisco, CA 94107 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 307336677 OPENED FEB 24, 2005Closed

Accident · Partial · Safety · 80 employees at the site · Closed Aug 2, 2005

855 B St., Hayward, CA 94541 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Incident on Feb 3, 2005: Employee fractures wrist in fall from extension ladder

On the morning of February 3, 2005, Employee #1, a carpenter, was assigned by hi s foreman to the task of cutting notches out of the bottom plate of a wall panel . The panel was at the bottom of a third level, that was being added to a two-st ory municipal parking structure. Employee #1 used a Saws-All to cut the notches. The notches were placed for hanging scaffold brackets. To reach the bottom plat e Employee #1 used a Werner, 24-ft fiberglass extension ladder. The ladder was s itting on the flat, level surface of the sidewalk next to the building. The work er ascended and descended the ladder about ten times prior to the incident. He m oved the ladder approximately seven ft along the wall after cutting each notch. Employee #1 climbed the ladder to the height of 16 ft carrying a scaffold bracke t in his right hand. He turned to his right side to place the scaffold bracket i n the notch, outside the plane of the ladder. As he turned to his right, the lad der shifted to the left, and Employee #1 lost his balance. He fell approximately 16 ft to the concrete sidewalk. The impact of Employee #1's body striking again st the cement sidewalk fractured his wrist. Employee #1 was hospitalized. Althou gh sitting on a level, flat surface, the ladder was not tied, blocked, or otherw ise secured to prevent its being displaced.

No citations from this inspection.

15 older inspections

Inspection 307334888 OPENED SEP 9, 2004Closed

Unprogrammed related · Partial · Safety · 9 employees at the site · Closed Feb 9, 2005

1401 Jackson Street, Oakland, CA 94612 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 119633618 OPENED AUG 27, 2004Closed

Planned · Complete · Safety · 16 employees at the site · Closed Aug 27, 2004

Third & C Street, San Rafael, CA 94901 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1620 B
Other-than-serious$450$0Aug 27, 2004Final

Inspection 300841244 OPENED JUN 16, 2004Closed

Complaint · Complete · Safety · 33 employees at the site · Closed Jan 22, 2007

100 N. First Way, P.o. Box 1521, Patterson, CA 95363 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1629 A04
Other-than-serious$150$0Sep 8, 2004Final

Inspection 125521617 OPENED APR 13, 1999Closed

Unprogrammed related · Complete · Safety · 11 employees at the site · Closed Jun 18, 2002

2000 Bridgepointe Circle, San Mateo, CA 94403 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 125516955 OPENED JUL 6, 1998Closed

Planned · Complete · Safety · 11 employees at the site · Closed Jul 17, 1998

2000 Bridgepointe Circle, San Mateo, CA 94403 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1670 A
Other-than-serious$0$0Jul 17, 1998Final

Inspection 125579821 OPENED JAN 20, 1998Closed

Unprogrammed other · Partial · Safety · 75 employees at the site · Closed Apr 29, 1998

3642 Juliet Lane, Santa Clara, CA 95050 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 341 A
Other-than-serious$0$0Apr 29, 1998Closed

Inspection 125661041 OPENED MAR 19, 1996Closed

Complaint · Partial · Safety · 2 employees at the site · Closed Apr 5, 1996

2425 Stockton Blvd., Sacramento, CA 95814 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 125863159 OPENED NOV 2, 1995Closed

Accident · Partial · Safety · 21 employees at the site · Closed Oct 30, 1997

2425 Stockton Blvd., Sacramento, CA 90000 · OSHA's record · Phone and website on Google Maps

Incident on Jul 26, 1995: Employee injured in fall from falsework platform

At about 9:45 on July 26, 1995, Employee #1, a carpenter for Peck and Hiller Co. , a concrete construction contractor, in Sacramento, CA, was working at the site of a new Shriner's Hospital. Employee #1 climbed from a second floor parking ga rage opening onto a falsework platform to retrieve a tool dropped from above ear lier. When climbing back into the garage, he slipped and fell on the 4 in. by 4 in. diagonal brace, 42 in. below the opening, being used as an access ramp to th e platform about 17 ft from the ground. First aid was applied and he was transpo rted by ambulance to Kaiser North Hospital, where he was treated for a broken pe lvis and multiple internal injuries. There had been no stair, ramp, or ladder us ed to provide access and egress from the work area.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1629 A03
Other-than-serious$5,000$450Jan 5, 1996Final

Inspection 111803292 OPENED OCT 27, 1995Closed

Accident · Complete · Safety · 95 employees at the site · Closed May 10, 1996

1201 Veterans Blvd., Redwood City, CA 94063 · OSHA's record · Phone and website on Google Maps

Incident on Oct 18, 1995: Employee injured in fall when deck collapses

Employee #1 was using a pallet jack to move a large stack of plywood sheets when a floor form support beam broke underneath him. The deck collapsed and Employee #1 fell with it to a lower floor. He sustained only minor injuries.

No citations from this inspection.

Inspection 119742955 OPENED JUN 13, 1995Closed

Unprogrammed other · Partial · Safety · 25 employees at the site · Closed Jun 20, 1996

1201 Veterans Blvd., Redwood City, CA 94063 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 341 A02
Other-than-serious$625$0Nov 10, 1995Final

Inspection 111952776 OPENED FEB 1, 1995Closed

Referral · Complete · Safety · 12 employees at the site · Closed Feb 23, 1995

1965 Latham St., Mountain View, CA 94040 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 119613354 OPENED MAR 23, 1994Closed

Unprogrammed other · Complete · Safety · 9 employees at the site · Closed Jul 21, 1994

100 Larkin St., San Francisco, CA 94102 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1524 A04
Other-than-serious$110$110Apr 22, 1994Closed

Inspection 107082810 OPENED JUN 13, 1988Closed

Unprogrammed related · Complete · Safety · 50 employees at the site · Closed Mar 22, 1989

349 S. Market Street, San Jose, CA 95103 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 103414397 OPENED MAY 2, 1988Closed

Unprogrammed related · Complete · Safety · 13 employees at the site · Closed May 24, 1989

303 Circle Dricve North, Los Angeles, CA 90024 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 2
29 CFR 1926.405(a)(2)(iii) · Job-site wiring
Other-than-serious$480$0Jun 9, 1988Final
Citation 1, item 3
29 CFR 1926.450(a)(9) · Scope, application and definitions applicable to this subpart
Other-than-serious$400$0Jun 9, 1988Final
Citation 1, item 4
29 CFR 1926.450(b)(8) · Scope, application and definitions applicable to this subpart
Other-than-serious$560$0Jun 9, 1988Final
Citation 1, item 5
29 CFR 1926.500(b)(1) · Scope, application, and definitions applicable to this subpart
Serious$560$714Jun 9, 1988Final

Inspection 107080434 OPENED MAR 30, 1988Closed

Planned · Complete · Safety · 4 employees at the site · Closed Apr 5, 1988

153 Lake Merced Blvd., Daly City, CA 94014 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(a)(2)(iii)

(iii) Guarding. For temporary wiring over 600 volts, nominal, fencing, barriers, or other effective means shall be provided to prevent access of other than authorized and qualified personnel.

29 CFR 1926.450 · Scope, application and definitions applicable to this subpart

29 CFR 1926.450(a)(9)

(a) Scope and application. This subpart applies to all scaffolds used in workplaces covered by this part. It does not apply to crane or derrick suspended personnel platforms. The criteria for aerial lifts are set out exclusively in § 1926.453.

29 CFR 1926.450(b)(8)

(b) Definitions. Adjustable suspension scaffold means a suspension scaffold equipped with a hoist(s) that can be operated by an employee(s) on the scaffold.

29 CFR 1926.500 · Scope, application, and definitions applicable to this subpart

Other poured concrete foundation and structure contractors employers in California

Alert subscribers get notified of each newly cited employer in California the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.