OSHA SearchOSHA records by employer

Pedro Garcia Najera: OSHA inspections and violations

Mooresville, North Carolina · Siding Contractors · NAICS 238170

1inspections
3citation items
$4,200current penalties
Feb 9, 2018last inspection

OSHA inspectors have visited Pedro Garcia Najera in North Carolina one time.

It opened on Feb 9, 2018 as a planned inspection, in Mooresville.

In all, OSHA issued 3 citation items: 3 serious.

The penalties, $4,200 in total, stand where OSHA first set them.

The rule cited most here is 1926.451 (scaffolds, general requirements), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Pedro Garcia Najera averages $4,200 across 1 cited inspection.

Pedro Garcia Najera: OSHA citation items per year, 2018 to 2018
Citation items per year, by inspection date.

North Carolina · latest 90 days of OSHA records

234employers cited

14 of them in the same industry

Get notified the morning OSHA posts each new citation in North Carolina: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in North Carolina

Checking a subcontractor, a client or your own company? Watch Pedro Garcia Najera and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342942174 OPENED FEB 9, 2018Closed

Planned · Partial · Safety · 2 employees at the site · Closed Mar 11, 2022

104 Lassen Lane, Mooresville, NC 28117 · Siding Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$2,100$2,100Mar 5, 2018Final
Citation 1, item 1b
29 CFR 1926.451(b)(5)(ii) · Scaffolds, general requirements
Serious$0$0Mar 5, 2018Final
Citation 1, item 2
29 CFR 1926.452(j)(2) · Rules for each type of scaffold
Serious$2,100$2,100Mar 5, 2018Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(5)(ii)

(ii) Each platform greater than 10 feet in length shall not extend over its support more than 18 inches (46 cm), unless it is designed and installed so that the cantilevered portion of the platform is able to support employees without tipping, or has guardrails which block employee access to the cantilevered end.

29 CFR 1926.451(g)(1)(vii)

(vii) For all scaffolds not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, each employee shall be protected by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.452(j)(2)

(2) Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled.

Other siding contractors employers in North Carolina

Alert subscribers get notified of each newly cited employer in North Carolina the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.