OSHA SearchOSHA records by employer

Pedro Velazquez: OSHA inspections and violations

Conroe, Texas · Masonry Contractors · NAICS 238140

3inspections
15citation items
$20,420current penalties
Mar 24, 2022last inspection

Since 2014, OSHA inspectors have visited Pedro Velazquez in Texas 3 times.

The most recent inspection opened on Mar 24, 2022 as a planned inspection, in Waxahachie.

In all, OSHA issued 15 citation items: 11 serious, 3 repeat and 1 other-than-serious.

The proposed penalties came to $28,166; today they stand at $20,420, 28% less.

The rule cited most here is 1926.451 (scaffolds, general requirements), 8 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Pedro Velazquez averages $6,340 across 1 cited inspection.

Pedro Velazquez: OSHA citation items per year, 2014 to 2022
Citation items per year, by inspection date.

Texas · latest 90 days of OSHA records

391employers cited

13 of them in the same industry

Get notified the morning OSHA posts each new citation in Texas: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Texas

Checking a subcontractor, a client or your own company? Watch Pedro Velazquez and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345859110 OPENED MAR 24, 2022Closed

Planned · Partial · Health · 3 employees at the site · Closed Sep 8, 2025

643 Avalon Drive, Waxahachie, TX 75165 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.102(a)(1) · Eye and face protection in construction
Serious$2,486$1,492Apr 22, 2022Final
Citation 1, item 2
29 CFR 1910.134(a)(2) · Respiratory protection
Serious$2,486$1,492Apr 22, 2022Final
Citation 1, item 3
29 CFR 1926.300(b)(1) · Tools—Hand and Power: general requirements
Serious$3,729$2,237Apr 22, 2022Final
Citation 1, item 4a
29 CFR 1926.1153(c)(1) · Silica dust in construction
Serious$1,865$1,119Apr 22, 2022Final
Citation 1, item 4b
29 CFR 1926.1153(d)(2)(i) · Silica dust in construction
Serious$0$0Apr 22, 2022Final

Inspection 339900516 OPENED AUG 14, 2014Closed

Planned · Partial · Safety · 20 employees at the site · Closed Jul 9, 2015

22515 Ebbets Field, Spring, TX 77388 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Repeat$4,400$4,400Aug 28, 2014Final
Citation 1, item 1b
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Repeat$0$0Aug 28, 2014Final
Citation 1, item 2
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Repeat$4,400$4,400Aug 28, 2014Final

Inspection 339629768 OPENED MAR 11, 2014Closed

Planned · Complete · Safety · 25 employees at the site · Closed Feb 5, 2015

213 Dove Meadow Dr., Conroe, TX 77384 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.100(a) · Hard hats in construction
Serious$2,400$1,440Apr 24, 2014Final
Citation 1, item 1b
29 CFR 1926.451(h)(1) · Scaffolds, general requirements
Serious$0$0Apr 24, 2014Final
Citation 1, item 2a
29 CFR 1926.451(b)(1)(i) · Scaffolds, general requirements
Serious$2,800$1,680Apr 24, 2014Final
Citation 1, item 2b
29 CFR 1926.451(b)(2) · Scaffolds, general requirements
Serious$0$0Apr 24, 2014Final
Citation 1, item 3
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$2,000$1,200Apr 24, 2014Final
Citation 1, item 4
29 CFR 1926.451(g)(4)(iv) · Scaffolds, general requirements
Serious$1,600$960Apr 24, 2014Final
Citation 2, item 1
29 CFR 1926.403(b)(1)(i) · Electrical equipment on job sites
Other-than-serious$0$0Apr 24, 2014Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(a)(2)

(2) The CNP system defaults selected for test pressure shall be set at −15 mm of water (-0.58 inches of water) and the modeled inspiratory flow rate shall be 53.8 liters per minute for performing fit tests.

29 CFR 1926.100 · Hard hats in construction

29 CFR 1926.100(a)

(a) Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, shall be protected by protective helmets.

29 CFR 1926.102 · Eye and face protection in construction

29 CFR 1926.102(a)(1)

(a) General. (1) The employer shall ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.

29 CFR 1926.1153 · Silica dust in construction

29 CFR 1926.300 · Tools—Hand and Power: general requirements

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.451 · Scaffolds, general requirements

Other masonry contractors employers in Texas

Alert subscribers get notified of each newly cited employer in Texas the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.