Pfa Contracting Inc. has one OSHA inspection on record in New York.

OSHA opened it on Dec 10, 2019 after a complaint, in New Rochelle.

From that inspection OSHA issued 4 citation items: 4 serious.

OSHA proposed $11,935 in penalties. After settlements and reviews the total is $7,500, down 37%.

Most often, OSHA cited 1926.651, excavations (2 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Pfa Contracting Inc. averages $7,500 over 1 cited inspection in that time.

Pfa Contracting Inc.: OSHA citation items per year, 2019 to 2019
Citation items per year, by inspection date.

Want to know if OSHA cites Pfa Contracting Inc. again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 344500939 OPENED DEC 10, 2019Closed

Complaint · Complete · Safety · 4 employees at the site · Closed Jul 10, 2025

Ifo 39-41 S. Division St., New Rochelle, NY 10805 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.200(g)(2) · Accident prevention signs and tags
Serious$2,842$1,786Jan 2, 2020Final
Citation 1, item 2
29 CFR 1926.651(c)(2) · Excavations
Serious$2,273$1,428Jan 2, 2020Final
Citation 1, item 3
29 CFR 1926.651(k)(1) · Excavations
Serious$2,842$1,786Jan 2, 2020Final
Citation 1, item 4
29 CFR 1926.652(a)(1) · Trench protection
Serious$3,978$2,500Jan 2, 2020Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.200 · Accident prevention signs and tags

29 CFR 1926.200(g)(2)

(2) The design and use of all traffic control devices, including signs, signals, markings, barricades, and other devices, for protection of construction workers shall conform to Part 6 of the MUTCD (incorporated by reference, see § 1926.6).

29 CFR 1926.651 · Excavations

29 CFR 1926.651(c)(2)

(2) Means of egress from trench excavations. A stairway, ladder, ramp or other safe means of egress shall be located in trench excavations that are 4 feet (1.22 m) or more in depth so as to require no more than 25 feet (7.62 m) of lateral travel for employees.

29 CFR 1926.651(k)(1)

(k) Inspections. (1) Daily inspections of excavations, the adjacent areas, and protective systems shall be made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. An inspection shall be conducted by the competent person prior to the start of work and as needed throughout the shift. Inspections shall also be made after every rainstorm or other hazard increasing occurrence. These inspections are only required when employee exposure can be reasonably anticipated.

29 CFR 1926.652 · Trench protection