Inspection 346273188 OPENED OCT 11, 2022Closed
1765 N. Miami Avenue, Miami, FL 33136 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Pine Construction of Florida, LLC has 3 OSHA inspections on record in Florida, the first in 2022.
OSHA's last visit started on Oct 11, 2022 on a referral, in Miami.
Across those inspections OSHA issued 3 citation items: 3 serious.
OSHA proposed $17,403 in penalties. After settlements and reviews the total is $10,442, down 40%.
Most often, OSHA cited 1926.451, scaffolds, general requirements (3 items).
For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Pine Construction of Florida, LLC averages $10,442 over 1 cited inspection in that time.
It reported 1 severe injury to OSHA since 2015.
Florida · latest 90 days of OSHA records
320employers cited
2 of them in the same industry
Get notified the morning OSHA posts each new citation in Florida: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Florida
Checking a subcontractor, a client or your own company? Watch Pine Construction of Florida, LLC and get notified the morning OSHA posts a new citation for it.
Watch this company1765 N. Miami Avenue, Miami, FL 33136 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
575 South Rosemary Avenue, West Palm Beach, FL 33401 · New Multifamily Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
5950 N Kendall Drive, Pinecrest, FL 33156 · New Single-Family Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.451(b)(1)(ii) · Scaffolds, general requirements |
Serious | $5,801 | $3,481 | May 13, 2022 | Final |
| Citation 1, item 2 29 CFR 1926.451(e)(1) · Scaffolds, general requirements |
Serious | $5,801 | $3,481 | May 13, 2022 | Final |
| Citation 1, item 3 29 CFR 1926.451(f)(3) · Scaffolds, general requirements |
Serious | $5,801 | $3,481 | May 13, 2022 | Final |
Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 1 report on file.
Mar 9, 2022, Pinecrest: Hospitalization · fractures · hip(s)
An employee was directing an all terrain forklift when a bundle of plywood broke and 10 to 15 pieces of plywood landed on top of the employee. The employee suffered a broken hip and was hospitalized.
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.451(b)(1)(ii)
(ii) Where the employer makes the demonstration provided for in paragraph (b)(1)(i) of this section, the platform shall be planked or decked as fully as possible and the remaining open space between the platform and the uprights shall not exceed 9 1/2 inches (24.1 cm).
29 CFR 1926.451(e)(1)
(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.
29 CFR 1926.451(f)(3)
(3) Scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity.
Alert subscribers get notified of each newly cited employer in Florida the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.