OSHA SearchOSHA records by employer

Porter Buckley Construction Group, LLC: OSHA inspections and violations

Towson, Maryland · Siding Contractors · NAICS 238170

1inspections
4citation items
$1,437current penalties
Apr 27, 2017last inspection

OSHA inspectors have visited Porter Buckley Construction Group, LLC in Maryland one time.

It opened on Apr 27, 2017 as a planned inspection, in Towson.

In all, OSHA issued 4 citation items: 3 serious and 1 other-than-serious.

The penalties, $1,437 in total, stand where OSHA first set them.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Porter Buckley Construction Group, LLC averages $1,437 across 1 cited inspection.

Porter Buckley Construction Group, LLC: OSHA citation items per year, 2017 to 2017
Citation items per year, by inspection date.

Maryland · latest 90 days of OSHA records

185employers cited

4 of them in the same industry

Get notified the morning OSHA posts each new citation in Maryland: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Maryland

Checking a subcontractor, a client or your own company? Watch Porter Buckley Construction Group, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342294048 OPENED APR 27, 2017Closed

Planned · Complete · Safety · 2 employees at the site · Closed Aug 3, 2017

516 East Seminary Avenue, Towson, MD 21286 · Siding Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.304(h)(1) · Woodworking tools
Serious$312$312Jul 13, 2017Final
Citation 1, item 2
29 CFR 1926.405(b)(2) · Job-site wiring
Serious$375$375Jul 13, 2017Final
Citation 1, item 3
29 CFR 1926.451(g)(1)(i) · Scaffolds, general requirements
Serious$750$750Jul 13, 2017Final
Citation 2, item 1
29 CFR 1926.403(b)(2) · Electrical equipment on job sites
Other-than-serious$0$0Jul 13, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.304 · Woodworking tools

29 CFR 1926.304(h)(1)

(h) Hand-fed crosscut table saws. (1) Each circular crosscut table saw shall be guarded by a hood which shall meet all the requirements of paragraph (i)(1) of this section for hoods for circular ripsaws.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(b)(2)

(2) Installation and use. Listed, labeled, or certified equipment shall be installed and used in accordance with instructions included in the listing, labeling, or certification.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(b)(2)

(2) Covers and canopies. All pull boxes, junction boxes, and fittings shall be provided with covers. If metal covers are used, they shall be grounded. In energized installations each outlet box shall have a cover, faceplate, or fixture canopy. Covers of outlet boxes having holes through which flexible cord pendants pass shall be provided with bushings designed for the purpose or shall have smooth, well-rounded surfaces on which the cords may bear.

29 CFR 1926.451 · Scaffolds, general requirements

Other siding contractors employers in Maryland

Alert subscribers get notified of each newly cited employer in Maryland the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.