Poy Builders Inc.: OSHA inspections and violations

Providence, Rhode Island · Roofing Contractors · NAICS 238160

2inspections
7citation items
$2,550current penalties
May 5, 2016last inspection

Poy Builders Inc. has 2 OSHA inspections on record in Rhode Island, the first in 1992.

OSHA's last visit started on May 5, 2016 as a planned inspection, in Warren.

Across those inspections OSHA issued 7 citation items: 6 serious and 1 other-than-serious.

OSHA proposed $4,000 in penalties. After settlements and reviews the total is $2,550, down 36%.

Most often, OSHA cited 1926.405, job-site wiring (4 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Poy Builders Inc. averages $1,950 over 1 cited inspection in that time.

Poy Builders Inc.: OSHA citation items per year, 1992 to 2016
Citation items per year, by inspection date.

Rhode Island · latest 90 days of OSHA records

85employers cited

7 of them in the same industry

Get notified the morning OSHA posts each new citation in Rhode Island: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Rhode Island

Checking a subcontractor, a client or your own company? Watch Poy Builders Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341450328 OPENED MAY 5, 2016Closed

Planned · Partial · Safety · 6 employees at the site · Closed Apr 6, 2017

205 Child St., Warren, RI 02885 · Roofing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(11) · Fall protection in construction
Serious$2,800$1,950Jun 15, 2016Final

Inspection 17947011 OPENED JUN 16, 1992Closed

Planned · Complete · Safety · 2 employees at the site · Closed Aug 19, 1992

30 Fenner Street, Providence, RI 02903 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.405(a)(2)(iib) · Job-site wiring
Serious$600$300Jul 8, 1992Closed
Citation 1, item 1b
29 CFR 1926.405(a)(2)(iic) · Job-site wiring
Serious$0$0Jul 8, 1992Closed
Citation 1, item 1c
29 CFR 1926.405(a)(2)(iie) · Job-site wiring
Serious$0$0Jul 8, 1992Closed
Citation 1, item 1d
29 CFR 1926.405(a)(2)(iif) · Job-site wiring
Serious$0$0Jul 8, 1992Closed
Citation 1, item 2
29 CFR 1926.1053(b)(1) · Ladders in construction
Serious$600$300Jul 8, 1992Closed
Citation 2, item 1
29 CFR 1926.59(e)(1) · Hazard communication
Other-than-serious$0$0Jul 8, 1992Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.1053(b)(1)

(1) When portable ladders are used for access to an upper landing surface, the ladder side rails shall extend at least 3 feet (.9 m) above the upper landing surface to which the ladder is used to gain access; or, when such an extension is not possible because of the ladder's length, then the ladder shall be secured at its top to a rigid support that will not deflect, and a grasping device, such as a grabrail, shall be provided to assist employees in mounting and dismounting the ladder. In no case shall the extension be such that ladder deflection under a load would, by itself, cause the ladder to slip off its support.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(a)(2)(iib)

(B) Branch circuits shall originate in a power outlet or panelboard. Conductors shall be run as multiconductor cord or cable assemblies or open conductors, or shall be run in raceways. All conductors shall be protected by overcurrent devices at their ampacity. Runs of open conductors shall be located where the conductors will not be subject to physical damage, and the conductors shall be fastened at intervals not exceeding 10 feet (3.05 m). No branch-circuit conductors shall be laid on the floor. Each branch circuit that supplies receptacles or fixed equipment shall contain a separate equipment grounding conductor if the branch circuit is run as open conductors.

29 CFR 1926.405(a)(2)(iic)

(C) Receptacles shall be of the grounding type. Unless installed in a complete metallic raceway, each branch circuit shall contain a separate equipment grounding conductor, and all receptacles shall be electrically connected to the grounding conductor. Receptacles for uses other than temporary lighting shall not be installed on branch circuits which supply temporary lighting. Receptacles shall not be connected to the same ungrounded conductor of multiwire circuits which supply temporary lighting.

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.59 · Hazard communication

Other roofing contractors employers in Rhode Island

Alert subscribers get notified of each newly cited employer in Rhode Island the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.