Premier Group: OSHA inspections and violations

Baltimore, Maryland · Commercial and Institutional Building Construction · NAICS 236220

1inspections
3citation items
$11,172current penalties
Jun 4, 2026last inspection

OSHA inspectors have visited Premier Group in Maryland one time.

It opened on Jun 4, 2026 after a complaint, in Baltimore and is still open.

In all, OSHA issued 3 citation items: 3 serious.

The penalties, $11,172 in total, stand where OSHA first set them.

Among construction employers, the typical cited inspection since 2015 ends with a $3,078 penalty. Premier Group averages $11,172 across 1 cited inspection.

Premier Group: OSHA citation items per year, 2026 to 2026
Citation items per year, by inspection date.

Want to know if OSHA cites Premier Group again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 348978883 OPENED JUN 4, 2026Open

Complaint · Partial · Safety · 60 employees at the site · Open

10 N Greene Street, Baltimore, MD 21201 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.404(b)(1)(ii) · Ground-fault protection on job sites
Serious$3,724$3,724Sep 1, 2026Final
Citation 1, item 2a
29 CFR 1926.501(b)(10) · Fall protection in construction
Serious$7,448$7,448Sep 1, 2026Final
Citation 1, item 2b
29 CFR 1926.502(f)(3) · Fall protection systems
Serious$0$0Sep 1, 2026Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(b)(1)(ii)

(ii) Ground-fault circuit interrupters. All 120-volt, single-phase, 15- and 20-ampere receptacle outlets on construction sites, which are not a part of the permanent wiring of the building or structure and which are in use by employees, shall have approved ground-fault circuit interrupters for personnel protection. Receptacles on a two-wire, single-phase portable or vehicle-mounted generator rated not more than 5kW, where the circuit conductors of the generator are insulated from the generator frame and all other grounded surfaces, need not be protected with ground-fault circuit interrupters.

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.501(b)(10)

(10) Roofing work on Low-slope roofs. Except as otherwise provided in paragraph (b) of this section, each employee engaged in roofing activities on low-slope roofs, with unprotected sides and edges 6 feet (1.8 m) or more above lower levels shall be protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system. Or, on roofs 50-feet (15.25 m) or less in width (see appendix A to subpart M of this part), the use of a safety monitoring system alone [i.e. without the warning line system] is permitted.

29 CFR 1926.502 · Fall protection systems

29 CFR 1926.502(f)(3)

(3) No employee shall be allowed in the area between a roof edge and a warning line unless the employee is performing roofing work in that area.

Other commercial and institutional building construction employers in Maryland

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.