OSHA SearchOSHA records by employer

Pro Kitchens & Baths, Inc.: OSHA inspections and violations

Rocky Mount, Virginia · Other Building Finishing Contractors · NAICS 238390

1inspections
6citation items
$938current penalties
May 8, 2025last inspection

OSHA has inspected Pro Kitchens & Baths, Inc. once in Virginia.

The inspection began on May 8, 2025 as a planned inspection, in Rocky Mount.

That inspection ended with 6 citation items: 4 serious and 2 other-than-serious.

Penalties were first proposed at $1,340 and now stand at $938, 30% lower after settlements or reviews.

Job-site wiring comes up most often in these citations: 3 items under 1926.405.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Pro Kitchens & Baths, Inc. averages $938 (1 cited inspection).

Pro Kitchens & Baths, Inc.: OSHA citation items per year, 2025 to 2025
Citation items per year, by inspection date.

Virginia · latest 90 days of OSHA records

249employers cited

Get notified the morning OSHA posts each new citation in Virginia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Virginia

Checking a subcontractor, a client or your own company? Watch Pro Kitchens & Baths, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348232612 OPENED MAY 8, 2025Closed

Planned · Complete · Safety · 3 employees at the site · Closed Jun 12, 2025

345 S. Main St., Rocky Mount, VA 24151 · Other Building Finishing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.405(d) · Job-site wiring
Serious$670$469May 20, 2025Final
Citation 1, item 1b
29 CFR 1926.405(b)(2) · Job-site wiring
Serious$0$0May 20, 2025Final
Citation 1, item 2a
29 CFR 1926.416(b)(2) · Electrical safety in construction
Serious$670$469May 20, 2025Final
Citation 1, item 2b
29 CFR 1926.405(g)(1)(iii) · Job-site wiring
Serious$0$0May 20, 2025Final
Citation 2, item 1
29 CFR 1926.34(b) · Means of egress
Other-than-serious$0$0May 20, 2025Final
Citation 2, item 2
29 CFR 1926.50(c) · Medical services and first aid
Other-than-serious$0$0May 20, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.34 · Means of egress

29 CFR 1926.34(b)

(b) Exit marking. Exits shall be marked by a readily visible sign. Access to exits shall be marked by readily visible signs in all cases where the exit or way to reach it is not immediately visible to the occupants.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(b)(2)

(2) Covers and canopies. All pull boxes, junction boxes, and fittings shall be provided with covers. If metal covers are used, they shall be grounded. In energized installations each outlet box shall have a cover, faceplate, or fixture canopy. Covers of outlet boxes having holes through which flexible cord pendants pass shall be provided with bushings designed for the purpose or shall have smooth, well-rounded surfaces on which the cords may bear.

29 CFR 1926.405(d)

(d) Switchboards and panelboards. Switchboards that have any exposed live parts shall be located in permanently dry locations and accessible only to qualified persons. Panelboards shall be mounted in cabinets, cutout boxes, or enclosures designed for the purpose and shall be dead front. However, panelboards other than the dead front externally-operable type are permitted where accessible only to qualified persons. Exposed blades of knife switches shall be dead when open.

29 CFR 1926.416 · Electrical safety in construction

29 CFR 1926.50 · Medical services and first aid

Other other building finishing contractors employers in Virginia

Alert subscribers get notified of each newly cited employer in Virginia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.