Inspection 346610868 OPENED APR 4, 2023Closed
127 Dixon Drive, Chestertown, MD 21620 · Unlaminated Plastics Profile Shape Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1a 29 CFR 1910.147(c)(4)(i) · Lockout/tagout |
Serious | $375 | $225 | Jul 3, 2023 | Final |
| Citation 1, item 1b 29 CFR 1910.147(c)(6)(i) · Lockout/tagout |
Serious | $0 | $0 | Jul 3, 2023 | Final |
| Citation 1, item 1c 29 CFR 1910.147(c)(7)(i) · Lockout/tagout |
Serious | $0 | $0 | Jul 3, 2023 | Final |
| Citation 1, item 2 29 CFR 1910.219(f)(3) · Belts, pulleys and power-transmission parts |
Serious | $600 | $300 | Jul 3, 2023 | Final |
| Citation 1, item 3 29 CFR 1910.242(b) · Hand and power tools |
Serious | $600 | $300 | Jul 3, 2023 | Final |
| Citation 1, item 4 29 CFR 1910.303(g)(2)(i) · Electrical equipment, general requirements |
Serious | $450 | $225 | Jul 3, 2023 | Final |
| Citation 1, item 5 29 CFR 1910.305(b)(1) · Electrical wiring methods |
Serious | $450 | $225 | Jul 3, 2023 | Final |
| Citation 1, item 6a 29 CFR 1910.1200(e)(1) · Hazard communication |
Serious | $525 | $315 | Jul 3, 2023 | Final |
| Citation 1, item 6b 29 CFR 1910.1200(h)(1) · Hazard communication |
Serious | $0 | $0 | Jul 3, 2023 | Final |
| Citation 2, item 1 29 CFR 1910.147(c)(6)(ii) · Lockout/tagout |
Other-than-serious | $0 | $0 | Jul 3, 2023 | Final |
| Citation 2, item 2 29 CFR 1910.147(c)(7)(iv) · Lockout/tagout |
Other-than-serious | $0 | $0 | Jul 3, 2023 | Final |
| Citation 2, item 3 29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods |
Other-than-serious | $0 | $0 | Jul 3, 2023 | Final |