OSHA SearchOSHA records by employer

Pytleski Finish Carpentry: OSHA inspections and violations

Petoskey, Michigan · Finish Carpentry Contractors · NAICS 238350

1inspections
14citation items
$2,000current penalties
Apr 21, 2026last inspection

OSHA has inspected Pytleski Finish Carpentry once in Michigan.

The inspection began on Apr 21, 2026 as a planned inspection, in Petoskey.

That inspection ended with 14 citation items: 7 serious and 7 other-than-serious.

Penalties were first proposed at $2,000 and still stand at $2,000.

Fall protection in construction comes up most often in these citations: 2 items under 1926.501.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Pytleski Finish Carpentry averages $2,000 (1 cited inspection).

Pytleski Finish Carpentry: OSHA citation items per year, 2026 to 2026
Citation items per year, by inspection date.

Michigan · latest 90 days of OSHA records

647employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in Michigan: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Michigan

Checking a subcontractor, a client or your own company? Watch Pytleski Finish Carpentry and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348888330 OPENED APR 21, 2026Closed

Planned · Complete · Safety · 4 employees at the site · Closed Jul 31, 2026

3716 Cliffs Dr, Petoskey, MI 49770 · Finish Carpentry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$400$400May 7, 2026Final
Citation 1, item 1b
29 CFR 1926.501(b)(4)(ii) · Fall protection in construction
Serious$0$0May 7, 2026Final
Citation 1, item 1c
29 CFR 408.40114(1)
Serious$0$0May 7, 2026Final
Citation 1, item 2
29 CFR 408.41124(5)
Serious$400$400May 7, 2026Final
Citation 1, item 3
29 CFR 408.42518(2)
Serious$400$400May 7, 2026Final
Citation 1, item 4
29 CFR 1926.102(a)(1) · Eye and face protection in construction
Serious$400$400May 7, 2026Final
Citation 1, item 5
29 CFR 408.41124(10)
Serious$400$400May 7, 2026Final
Citation 2, item 1
29 CFR 408.41851(2)
Other-than-serious$0$0May 7, 2026Final
Citation 2, item 2
29 CFR 1926.1404(h) · Assembly/Disassembly—general requirements (applies to all assembly and disassembly operations)
Other-than-serious$0$0May 7, 2026Final
Citation 2, item 3
29 CFR 1926.1412(f)(1) · Inspections
Other-than-serious$0$0May 7, 2026Final
Citation 2, item 4
29 CFR 1926.1413(c)(1) · Wire rope—inspection
Other-than-serious$0$0May 7, 2026Final
Citation 2, item 5
29 CFR 1926.1424(a)(2) · Work area control
Other-than-serious$0$0May 7, 2026Final
Citation 2, item 6
29 CFR 1926.1427(a) · Operator training, certification, and evaluation
Other-than-serious$0$0May 7, 2026Final
Citation 2, item 7
29 CFR 1926.1428(a) · Signal person qualifications
Other-than-serious$0$0May 7, 2026Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.102 · Eye and face protection in construction

29 CFR 1926.102(a)(1)

(a) General. (1) The employer shall ensure that each affected employee uses appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.

29 CFR 1926.1404 · Assembly/Disassembly—general requirements (applies to all assembly and disassembly operations)

29 CFR 1926.1404(h)

(h) Addressing specific hazards. The A/D director supervising the assembly/disassembly operation must address the hazards associated with the operation, which include:

29 CFR 1926.1412 · Inspections

29 CFR 1926.1412(f)(1)

(f) Annual/comprehensive. (1) At least every 12 months the equipment must be inspected by a qualified person in accordance with paragraph (d) of this section (each shift) except that the corrective action set forth in paragraphs (f)(4), (f)(5), and (f)(6) of this section must apply in place of the corrective action required by paragraphs (d)(2) and (d)(3) of this section.

29 CFR 1926.1413 · Wire rope—inspection

29 CFR 1926.1424 · Work area control

29 CFR 1926.1427 · Operator training, certification, and evaluation

29 CFR 1926.1428 · Signal person qualifications

29 CFR 1926.501 · Fall protection in construction

Other finish carpentry contractors employers in Michigan

Alert subscribers get notified of each newly cited employer in Michigan the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.