OSHA SearchOSHA records by employer

Quality Custom Molding LLC: OSHA inspections and violations

Linn, Missouri · All Other Plastics Product Manufacturing · NAICS 326199

4inspections
12citation items
$6,131current penalties
Jan 22, 2019last inspection

Since 2006, OSHA inspectors have visited Quality Custom Molding LLC in Missouri 4 times.

The most recent inspection opened on Jan 22, 2019 after a complaint, in Linn.

In all, OSHA issued 12 citation items: 9 serious and 3 other-than-serious.

The proposed penalties came to $23,715; today they stand at $6,131, 74% less.

The rule cited most here is 1910.147 (lockout/tagout), 4 times.

Among manufacturing employers, the typical cited inspection since 2015 ends with a $4,500 penalty. Quality Custom Molding LLC averages $2,363 across 2 cited inspections.

Quality Custom Molding LLC: OSHA citation items per year, 2006 to 2019
Citation items per year, by inspection date.

Missouri · latest 90 days of OSHA records

121employers cited

Get notified the morning OSHA posts each new citation in Missouri: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Missouri

Checking a subcontractor, a client or your own company? Watch Quality Custom Molding LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343723383 OPENED JAN 22, 2019Closed

Complaint · Partial · Safety · 30 employees at the site · Closed Apr 15, 2019

209 W. Main Street, Linn, MO 65051 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(a)(1) · Machine guarding
Serious$5,304$1,500Feb 4, 2019Final
Citation 1, item 2
29 CFR 1910.303(g)(1) · Electrical equipment, general requirements
Other-than-serious$3,978$500Feb 4, 2019Final
Citation 1, item 3
29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods
Serious$3,978$500Feb 4, 2019Final

Inspection 341735454 OPENED AUG 29, 2016Closed

Complaint · Partial · Safety · 30 employees at the site · Closed Nov 22, 2016

209 West Main St., Linn, MO 65051 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.304(g)(5) · Grounding and circuit protection
Other-than-serious$3,180$2,226Sep 26, 2016Final

Inspection 331905448 OPENED JAN 26, 2012Closed

Planned · Complete · Safety · 20 employees at the site · Closed Jan 28, 2013

209 West Main Street, Linn, MO 65051 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.147(c)(4)(ii) · Lockout/tagout
Serious$1,800$300Feb 6, 2012Final
Citation 1, item 1b
29 CFR 1910.147(c)(6)(ii) · Lockout/tagout
Serious$0$0Feb 6, 2012Final
Citation 1, item 1c
29 CFR 1910.147(c)(7)(i)(b) · Lockout/tagout
Serious$0$0Feb 6, 2012Final
Citation 1, item 1d
29 CFR 1910.147(c)(7)(iv) · Lockout/tagout
Serious$0$0Feb 6, 2012Final
Citation 1, item 3
29 CFR 1910.212(a)(3)(ii) · Machine guarding
Serious$3,000$500Feb 6, 2012Final
Citation 1, item 4
29 CFR 1910.242(b) · Hand and power tools
Other-than-serious$1,800$200Feb 6, 2012Final

Inspection 310350871 OPENED NOV 3, 2006Closed

Planned · Partial · Safety · 16 employees at the site · Closed Dec 6, 2006

209 West Main Street, Linn, MO 65051 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.304(f)(4) · Grounding and circuit protection
Serious$375$225Nov 15, 2006Closed
Citation 1, item 2
29 CFR 1910.305(g)(1)(iii) · Electrical wiring methods
Serious$300$180Nov 15, 2006Closed

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(4)(ii)

(ii) The procedures shall clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, the following:

29 CFR 1910.147(c)(6)(ii)

(ii) The employer shall certify that the periodic inspections have been performed. The certification shall identify the machine or equipment on which the energy control procedure was being utilized, the date of the inspection, the employees included in the inspection, and the person performing the inspection.

29 CFR 1910.147(c)(7)(i)(b)

(B) Each affected employee shall be instructed in the purpose and use of the energy control procedure.

29 CFR 1910.212 · Machine guarding

29 CFR 1910.242 · Hand and power tools

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.305 · Electrical wiring methods

Other all other plastics product manufacturing employers in Missouri

Alert subscribers get notified of each newly cited employer in Missouri the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.