OSHA SearchOSHA records by employer

Quality Pro Property Maintenance LLC: OSHA inspections and violations

Orlando, Florida · Painting and Wall Covering Contractors · NAICS 238320

1inspections
4citation items
$2,482current penalties
May 30, 2025last inspection

OSHA has inspected Quality Pro Property Maintenance LLC once in Florida.

The inspection began on May 30, 2025 as a planned inspection, in Orlando; the case is still open.

That inspection ended with 4 citation items: 4 serious.

Penalties were first proposed at $4,965 and now stand at $2,482, 50% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 3 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Quality Pro Property Maintenance LLC averages $2,482 (1 cited inspection).

Quality Pro Property Maintenance LLC: OSHA citation items per year, 2025 to 2025
Citation items per year, by inspection date.

Florida · latest 90 days of OSHA records

326employers cited

4 of them in the same industry

Get notified the morning OSHA posts each new citation in Florida: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Florida

Checking a subcontractor, a client or your own company? Watch Quality Pro Property Maintenance LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348278151 OPENED MAY 30, 2025Open

Planned · Partial · Safety · 7 employees at the site · Open

3120 S Kirkman Rd, Orlando, FL 32811 · Painting and Wall Covering Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$0$0Jun 5, 2025Final
Citation 1, item 2
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$0$0Jun 5, 2025Final
Citation 1, item 3a
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$4,965$2,482Jun 5, 2025Final
Citation 1, item 3b
29 CFR 1926.454(b) · Scaffold training
Serious$0$0Jun 5, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

29 CFR 1926.451(g)(4)(i)

(i) Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews.

29 CFR 1926.454 · Scaffold training

Other painting and wall covering contractors employers in Florida

Alert subscribers get notified of each newly cited employer in Florida the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.