OSHA SearchOSHA records by employer

Quality Steel Erecting Inc.: OSHA inspections and violations

Bridgeport, Ohio · Structural Steel and Precast Concrete Contractors · NAICS 238120

2inspections
3citation items
$3,864current penalties
Apr 16, 2015last inspection

Since 2012, OSHA inspectors have visited Quality Steel Erecting Inc. in Ohio 2 times.

The most recent inspection opened on Apr 16, 2015, in Saint Clairsville.

In all, OSHA issued 3 citation items: 3 serious.

The proposed penalties came to $5,520; today they stand at $3,864, 30% less.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Quality Steel Erecting Inc. averages $1,960 across 1 cited inspection.

Quality Steel Erecting Inc.: OSHA citation items per year, 2012 to 2015
Citation items per year, by inspection date.

Ohio · latest 90 days of OSHA records

257employers cited

Get notified the morning OSHA posts each new citation in Ohio: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Ohio

Checking a subcontractor, a client or your own company? Watch Quality Steel Erecting Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 340561513 OPENED APR 16, 2015Closed

Unprogrammed other · Partial · Safety · 20 employees at the site · Closed May 12, 2015

295 Mall Road, Saint Clairsville, OH 43950 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$2,800$1,960Apr 22, 2015Final

Inspection 335444196 OPENED JUL 27, 2012Closed

Planned · Complete · Safety · 7 employees at the site · Closed Oct 12, 2012

68 State Route 7, Bridgeport, OH 43912 · Structural Steel and Precast Concrete Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Serious$1,020$714Sep 7, 2012Final
Citation 1, item 2
29 CFR 1926.760(c)(3) · Fall protection
Serious$1,700$1,190Sep 7, 2012Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(g)(2)(iv)

(iv) Strain relief. Flexible cords shall be connected to devices and fittings so that strain relief is provided which will prevent pull from being directly transmitted to joints or terminal screws.

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.501(b)(1)

(b)(1) Unprotected sides and edges. Each employee on a walking/working surface (horizontal and vertical surface) with an unprotected side or edge which is 6 feet (1.8 m) or more above a lower level shall be protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems.

29 CFR 1926.760 · Fall protection

29 CFR 1926.760(c)(3)

(3) The boundaries of a CDZ shall be designated and clearly marked. The CDZ shall not be more than 90 feet (27.4 m) wide and 90 (27.4 m) feet deep from any leading edge. The CDZ shall be marked by the use of control lines or the equivalent. Examples of acceptable procedures for demarcating CDZ's can be found in appendix D to this subpart.

Other structural steel and precast concrete contractors employers in Ohio

Alert subscribers get notified of each newly cited employer in Ohio the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.