Inspection 348253741 OPENED MAY 13, 2025Closed
13531 E 40th Street, Tulsa, OK 74134 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
R&L Construction has 5 OSHA inspections on record in Oklahoma, the first in 2022.
OSHA's last visit started on May 13, 2025 as a planned inspection, in Tulsa.
Across those inspections OSHA issued 4 citation items: 4 serious.
OSHA proposed $29,790 in penalties. After settlements and reviews the total is $17,874, down 40%.
Most often, OSHA cited 1926.651, excavations (2 items).
For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. R&L Construction averages $17,874 over 1 cited inspection in that time.
Oklahoma · latest 90 days of OSHA records
53employers cited
Get notified the morning OSHA posts each new citation in Oklahoma: the employer, the site address, the rules broken and the penalty.
See who gets cited nextLatest cited in Oklahoma
Checking a subcontractor, a client or your own company? Watch R&L Construction and get notified the morning OSHA posts a new citation for it.
Watch this company13531 E 40th Street, Tulsa, OK 74134 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
N. Peoria And 36th, Tulsa, OK 74101 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1926.100(a) · Hard hats in construction |
Serious | $6,620 | $3,972 | Jul 28, 2025 | Final |
| Citation 1, item 2a 29 CFR 1926.652(a)(1) · Trench protection |
Serious | $11,585 | $6,951 | Jul 28, 2025 | Final |
| Citation 1, item 2b 29 CFR 1926.651(k)(1) · Excavations |
Serious | $0 | $0 | Jul 28, 2025 | Final |
| Citation 1, item 3 29 CFR 1926.651(c)(2) · Excavations |
Serious | $11,585 | $6,951 | Jul 28, 2025 | Final |
7102 N. Owasso Expressway, Owasso, OK 74055 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
E. Albany And S. 195th E Avenue, Broken Arrow, OK 74012 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Hwy 97 And 51st Street, Sand Springs, OK 74063 · New Single-Family Housing Construction (except For-Sale Builders) · OSHA's record · Phone and website on Google Maps
No citations from this inspection.
Current text from the Code of Federal Regulations. Some citations were issued under older wording.
29 CFR 1926.100(a)
(a) Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, shall be protected by protective helmets.
29 CFR 1926.651(c)(2)
(2) Means of egress from trench excavations. A stairway, ladder, ramp or other safe means of egress shall be located in trench excavations that are 4 feet (1.22 m) or more in depth so as to require no more than 25 feet (7.62 m) of lateral travel for employees.
29 CFR 1926.651(k)(1)
(k) Inspections. (1) Daily inspections of excavations, the adjacent areas, and protective systems shall be made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. An inspection shall be conducted by the competent person prior to the start of work and as needed throughout the shift. Inspections shall also be made after every rainstorm or other hazard increasing occurrence. These inspections are only required when employee exposure can be reasonably anticipated.
Alert subscribers get notified of each newly cited employer in Oklahoma the morning it is posted. See the alert plans.
Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.