4inspections
9citation items
$29,625current penalties
Sep 20, 2023last inspection

Rakar Inc has 4 OSHA inspections on record in California, the first in 2005.

OSHA's last visit started on Sep 20, 2023 after an accident, in Oxnard, and the case has not closed yet.

Across those inspections OSHA issued 9 citation items: 5 serious and 4 other-than-serious.

OSHA proposed $59,075 in penalties. After settlements and reviews the total is $29,625, down 50%.

For context, across all manufacturing employers the median penalty per cited inspection since 2015 is $4,500. Rakar Inc averages $12,150 over 2 cited inspections in that time.

Rakar Inc also files yearly injury logs with OSHA, summarized below.

Rakar Inc: OSHA citation items per year, 2005 to 2023
Citation items per year, by inspection date.

Want to know if OSHA cites Rakar Inc again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 346988173 OPENED SEP 20, 2023Open

Accident · Partial · Safety · 37 employees at the site · Open

1680 Universe Circle, Oxnard, CA 93030 · Aircraft Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 3328(G)
Other-than-serious$410$0Dec 28, 2023Final
Citation 2, item 1
29 CFR 3203(A)
Serious$4,950$495Dec 28, 2023Final
Citation 3, item 1
29 CFR 4184(B)
Serious$4,950$4,950Dec 28, 2023Final

Inspection 345372833 OPENED JUN 9, 2021Open

Accident · Partial · Safety · 53 employees at the site · Open

1700 Emerson Avenue, Oxnard, CA 93033 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Incident on Apr 28, 2021: Employee crushes thumb by press due to failure to follow lot

At 8:15 a.m. on April 28, 2021, Employee #1, employed as a machine operator, was demonstrating to two coworkers how to push out a plunger from a press. While performing the task, the molding moved, and the employee placed his hand onto the area where the plunger was supposed to be. The employee did not follow the proper Lockout/Tagout (LOTO) procedure, allowing the press to be energized. As a result, the employee's right thumb was crushed by the machine, leading to a permanent disfigurement. The employee was hospitalized. Doctors later performed an amputation of the thumb.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1 Other-than-serious$205$185Aug 12, 2021Final
Citation 2, item 1
29 CFR 3203(A)(7)
Serious$12,375$1,235Aug 12, 2021Final
Citation 3, item 1
29 CFR 3314(C)
Serious$12,375$1,235Aug 12, 2021Final
Citation 4, item 1
29 CFR 3314(G)
Serious$18,000$16,200Aug 12, 2021Final

Inspection 312308554 OPENED JUL 8, 2008Closed

Programmed other · Partial · Safety · 80 employees at the site · Closed Jul 12, 2008

1700 Emerson Ave, Oxnard, CA 93033 · Industrial Machinery Manufacturing · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 120322151 OPENED OCT 27, 2005Closed

Accident · Partial · Safety · 62 employees at the site · Closed Aug 28, 2007

1700 Emerson Ave., Oxnard, CA 93033 · All Other Plastics Product Manufacturing · OSHA's record · Phone and website on Google Maps

Incident on Aug 19, 2005: Employee is burned by injection molding machine

At approximately 7:45 a.m. on August 19, 2005, Employee #1 was operating a therm al plastic injection molding machine (New Britain Model, Serial Number 2579). Du ring the machine's operation, the injection unit is usually closed against the s prue bushing. According to Employee #1, the parts were not coming out correctly, so she opened the injection unit, cleaned the nozzle, and pushed the button to close the injection unit. She indicated she then observed a small amount of plas tic coming out of the injection unit. When she tried to remove the plastic with her gloved right hand, her hand became caught between the injection unit and the concave area surrounding the sprue bushing. Employee #1 was hospitalized for th ird-degree burns. Her supervisor indicated that he did not observe the accident but that a water line broke and Employee #1 was burned by the water that was hea ted to approximately 180 degrees Fahrenheit. The investigation was not conclusiv e on the cause of the burns (from the water or from the hot surface of the conca ve area surrounding the sprue bushing). The temperature of the concave area was measured to be 187 degrees Fahrenheit. The nozzle temperature was measured to be 130 degrees Fahrenheit. It was also not certain if her hand contacted the sprue bushing itself which was measured to be 296 degrees Fahrenheit. The polyester-b lend gloves that Employee #1 was wearing were able to provide some degree of ins ulation from hot surfaces, but not from the hot water.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 342 A
Other-than-serious$5,000$5,000Mar 8, 2006Final
Citation 1, item 4
29 CFR 3314 G
Other-than-serious$810$325Mar 8, 2006Final

Injury and illness logs

From the Form 300A summaries employers file with OSHA each year. Rate = recordable cases per 100 full-time workers.

In 2019, the Oxnard site logged 4 recordable injuries or illnesses among about 40 workers: 11.9 per 100 full-time workers, against a median of 2.6 for its industry. Those cases cost 3 days away from work.

Site and yearWorkersCasesDays-away casesRateIndustry median
Rakar Incorporated
Oxnard · 2019
40 4111.92.6

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 2510.4

Other all other plastics product manufacturing employers in California

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.