OSHA SearchOSHA records by employer

Rapid Construction Inc: OSHA inspections and violations

Stillwater, Minnesota · Drywall and Insulation Contractors · NAICS 238310

3inspections
2citation items
$250current penalties
May 4, 2022last inspection

OSHA has inspected Rapid Construction Inc 3 times in Minnesota since 2021.

The latest one began on May 4, 2022 as a planned inspection, in Saint Paul.

Those inspections ended with 2 citation items: 2 other-than-serious.

Penalties were first proposed at $250 and still stand at $250.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Rapid Construction Inc averages $125 (2 cited inspections).

Rapid Construction Inc: OSHA citation items per year, 2021 to 2022
Citation items per year, by inspection date.

Want to know if OSHA cites Rapid Construction Inc again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 345960660 OPENED MAY 4, 2022Closed

Planned · Complete · Safety · 2 employees at the site · Closed Dec 22, 2022

160 Wabasha St S, Saint Paul, MN 55107 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.405(a)(2)(ii)(i) · Job-site wiring
Other-than-serious$150$150Jun 15, 2022Final

Inspection 345386080 OPENED JUN 24, 2021Closed

Follow-up · Partial · Safety · 4 employees at the site · Closed Jul 7, 2021

107 Chestnut St, Stillwater, MN 55082 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 345269435 OPENED APR 8, 2021Closed

Planned · Complete · Safety · 4 employees at the site · Closed Jul 7, 2021

107 Chestnut St, Stillwater, MN 55082 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.403(e) · Electrical equipment on job sites
Other-than-serious$100$100May 11, 2021Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(e)

(e) Splices. Conductors shall be spliced or joined with splicing devices designed for the use or by brazing, welding, or soldering with a fusible metal or alloy. Soldered splices shall first be so spliced or joined as to be mechanically and electrically secure without solder and then soldered. All splices and joints and the free ends of conductors shall be covered with an insulation equivalent to that of the conductors or with an insulating device designed for the purpose.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(a)(2)(ii)(i)

(iii) Guarding. For temporary wiring over 600 volts, nominal, fencing, barriers, or other effective means shall be provided to prevent access of other than authorized and qualified personnel.

Other drywall and insulation contractors employers in Minnesota

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.