OSHA SearchOSHA records by employer

Red Bank-Public Works: OSHA inspections and violations

Red Bank, Tennessee · Highway, Street, and Bridge Construction · NAICS 237310

12inspections
22citation items
$0current penalties
Jan 5, 2018last inspection

OSHA has inspected Red Bank-Public Works 12 times in Tennessee since 1985.

The latest one began on Jan 5, 2018 as a planned inspection, in Red Bank.

Those inspections ended with 22 citation items: 13 serious and 9 other-than-serious.

None of the citations carried a penalty.

Electrical wiring methods comes up most often in these citations: 5 items under 1910.305.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Red Bank-Public Works averages $0 (1 cited inspection).

Red Bank-Public Works: OSHA citation items per year, 1985 to 2018
Citation items per year, by inspection date.

Tennessee · latest 90 days of OSHA records

321employers cited

11 of them in the same industry

Get notified the morning OSHA posts each new citation in Tennessee: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Tennessee

Checking a subcontractor, a client or your own company? Watch Red Bank-Public Works and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342863735 OPENED JAN 5, 2018Closed

Planned · Complete · Safety · Local government · 6 employees at the site · Closed Feb 26, 2018

1801 Pine Breeze Road, Red Bank, TN 37415 · General Automotive Repair · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR TCA 50-3-105(1)
Serious$0$0Jan 26, 2018Final
Citation 1, item 2
29 CFR 1910.243(c)(3) · Guarding of portable powered tools
Serious$0$0Jan 26, 2018Final
Citation 1, item 3
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Serious$0$0Jan 26, 2018Final
Citation 1, item 4
29 CFR 1910.303(f)(2) · Electrical equipment, general requirements
Serious$0$0Jan 26, 2018Final
Citation 1, item 5
29 CFR 1910.304(b)(2) · Grounding and circuit protection
Serious$0$0Jan 26, 2018Final
Citation 1, item 6
29 CFR 1910.304(g)(5) · Grounding and circuit protection
Serious$0$0Jan 26, 2018Final
Citation 1, item 7
29 CFR 1910.334(a)(2)(ii) · Using electrical equipment
Serious$0$0Jan 26, 2018Final

Inspection 315440867 OPENED MAR 3, 2011Closed

Planned · Complete · Safety · Local government · 7 employees at the site · Closed Apr 19, 2011

1 Pine Breeze Rd, Red Bank, TN 37415 · Other General Government Support · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.304(b)(2)(ii) · Grounding and circuit protection
Serious$0$0Mar 16, 2011Closed
Citation 1, item 2
29 CFR 1910.305(g)(1)(iv) · Electrical wiring methods
Serious$0$0Mar 16, 2011Closed
Citation 1, item 3
29 CFR 90007
Serious$0$0Mar 16, 2011Closed
Citation 2, item 1
29 CFR 1910.132(d)(2) · Personal protective equipment, general requirements
Other-than-serious$0$0Mar 16, 2011Closed

Inspection 309635316 OPENED JAN 10, 2006Closed

Planned · Complete · Safety · Local government · 20 employees at the site · Closed Mar 10, 2006

1 Pine Ridge Rd., Red Bank, TN 37415 · Parking Lots and Garages · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.212(b) · Machine guarding
Other-than-serious$0$0Jan 20, 2006Closed

Inspection 307208843 OPENED FEB 26, 2004Closed

Planned · Complete · Safety · Local government · 11 employees at the site · Closed Jul 26, 2004

1 Pine Ridge Rd., Red Bank, TN 37415 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.106(d)(2)(i) · Flammable liquids
Serious$0$0Jun 28, 2004Closed
Citation 1, item 2
29 CFR 1910.305(b)(1) · Electrical wiring methods
Serious$0$0Jun 28, 2004Closed

Inspection 305048266 OPENED FEB 12, 2002Closed

Planned · Complete · Safety · Local government · 18 employees at the site · Closed Apr 24, 2002

1 Pine Ridge Rd., Red Bank, TN 37415 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.304(e)(1)(iv) · Grounding and circuit protection
Other-than-serious$0$0Mar 6, 2002Closed
Citation 1, item 2
29 CFR 1910.305(b)(1) · Electrical wiring methods
Other-than-serious$0$0Mar 6, 2002Closed

Inspection 120588652 OPENED MAR 24, 1998Closed

Planned · Complete · Safety · Local government · 30 employees at the site · Closed May 8, 1998

1 Pine Ridge Rd., Red Bank, TN 37415 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.23(c)(1) · Guarding floor and wall openings and holes
Serious$0$0Apr 14, 1998Closed
Citation 2, item 1
29 CFR 1910.23(d)(1)(iv) · Guarding floor and wall openings and holes
Other-than-serious$0$0Apr 14, 1998Closed
Citation 2, item 2
29 CFR 1910.110(d)(10) · Storage and handling of liquefied petroleum gases
Other-than-serious$0$0Apr 14, 1998Closed
Citation 2, item 3
29 CFR 1910.303(f) · Electrical equipment, general requirements
Other-than-serious$0$0Apr 14, 1998Closed
Citation 2, item 4
29 CFR 1910.305(b)(1) · Electrical wiring methods
Other-than-serious$0$0Apr 14, 1998Closed

Inspection 111085452 OPENED SEP 26, 1991Closed

Planned · Complete · Safety · Local government · 4 employees at the site · Closed Sep 26, 1991

1 Pine Ridge Rd., Red Bank, TN 37415 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 107879355 OPENED FEB 15, 1990Closed

Planned · Complete · Safety · Local government · 3 employees at the site · Closed Mar 15, 1990

1 Pine Ridge Rd., Red Bank, TN 37415 · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.305(b)(2) · Electrical wiring methods
Other-than-serious$0$0Feb 21, 1990Closed
4 older inspections

Inspection 105571525 OPENED OCT 27, 1988Closed

Planned · Complete · Safety · Local government · 3 employees at the site · Closed Oct 27, 1988

1 Pine Ridge Rd., Red Bank, TN 37415 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 105533657 OPENED AUG 20, 1987Closed

Planned · Complete · Safety · Local government · 4 employees at the site · Closed Aug 20, 1987

1 Pine Ridge Rd., Red Bank, TN 37415 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 18432492 OPENED APR 24, 1986Closed

Planned · Complete · Safety · Local government · 4 employees at the site · Closed Apr 24, 1986

1 Pine Ridge Rd., Red Bank, TN 37415 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 3237021 OPENED JAN 16, 1985Closed

Planned · Complete · Safety · Local government · 4 employees at the site · Closed Jan 16, 1985

1 Pine Ridge Rd., Red Bank, TN 37415 · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.106 · Flammable liquids

29 CFR 1910.106(d)(2)(i)

(2) Design, construction, and capacity of containers—(i) General. Only approved containers and portable tanks shall be used. Metal containers and portable tanks meeting the requirements of and containing products authorized by chapter I, title 49 of the Code of Federal Regulations (regulations issued by the Hazardous Materials Regulations Board, Department of Transportation), shall be deemed to be acceptable.

29 CFR 1910.110 · Storage and handling of liquefied petroleum gases

29 CFR 1910.110(d)(10)

(10) Damage from vehicles. When damage to LP-Gas systems from vehicular traffic is a possibility, precautions against such damage shall be taken.

29 CFR 1910.132 · Personal protective equipment, general requirements

29 CFR 1910.132(d)(2)

(2) The employer shall verify that the required workplace hazard assessment has been performed through a written certification that identifies the workplace evaluated; the person certifying that the evaluation has been performed; the date(s) of the hazard assessment; and, which identifies the document as a certification of hazard assessment.

29 CFR 1910.212 · Machine guarding

29 CFR 1910.23 · Guarding floor and wall openings and holes

29 CFR 1910.243 · Guarding of portable powered tools

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.304 · Grounding and circuit protection

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.334 · Using electrical equipment

Other highway, street, and bridge construction employers in Tennessee

Alert subscribers get notified of each newly cited employer in Tennessee the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.