OSHA SearchOSHA records by employer

Red Dog Fencing LLC: OSHA inspections and violations

South Windsor, Connecticut · All Other Specialty Trade Contractors · NAICS 238990

1inspections
2citation items
$0current penalties
Oct 17, 2023last inspection

Red Dog Fencing LLC has one OSHA inspection on record in Connecticut.

OSHA opened it on Oct 17, 2023 after a complaint, in South Windsor.

From that inspection OSHA issued 2 citation items: 2 other-than-serious.

OSHA did not attach a penalty to any of these citations.

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Red Dog Fencing LLC averages $0 over 1 cited inspection in that time.

Red Dog Fencing LLC: OSHA citation items per year, 2023 to 2023
Citation items per year, by inspection date.

Connecticut · latest 90 days of OSHA records

87employers cited

3 of them in the same industry

Get notified the morning OSHA posts each new citation in Connecticut: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Connecticut

Checking a subcontractor, a client or your own company? Watch Red Dog Fencing LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 347041246 OPENED OCT 17, 2023Closed

Complaint · Partial · Safety · 3 employees at the site · Closed Feb 1, 2024

681 John Fitch Boulevard, South Windsor, CT 06074 · All Other Specialty Trade Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Other-than-serious$0$0Jan 2, 2024Final
Citation 1, item 2
29 CFR 1910.305(b)(2)(i) · Electrical wiring methods
Other-than-serious$0$0Jan 2, 2024Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.303(b)(2)

(2) Installation and use. Listed or labeled equipment shall be installed and used in accordance with any instructions included in the listing or labeling.

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.305(b)(2)(i)

(2) Covers and canopies. (i) All pull boxes, junction boxes, and fittings shall be provided with covers identified for the purpose. If metal covers are used, they shall be grounded. In completed installations, each outlet box shall have a cover, faceplate, or fixture canopy. Covers of outlet boxes having holes through which flexible cord pendants pass shall be provided with bushings designed for the purpose or shall have smooth, well-rounded surfaces on which the cords may bear.

Other all other specialty trade contractors employers in Connecticut

Alert subscribers get notified of each newly cited employer in Connecticut the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.