OSHA SearchOSHA records by employer

Red Hook Const Group Inc: OSHA inspections and violations

New York, New York · Site Preparation Contractors · NAICS 238910

2inspections
4citation items
$30,782current penalties
Mar 26, 2018last inspection

Red Hook Const Group Inc has 2 OSHA inspections on record in New York, the first in 2016.

OSHA's last visit started on Mar 26, 2018 to follow up on an earlier case, in New York.

Across those inspections OSHA issued 4 citation items: 4 serious.

OSHA proposed $30,782 in penalties and the amount has not been reduced.

Most often, OSHA cited 1926.703, requirements for cast-in-place concrete (2 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Red Hook Const Group Inc averages $30,782 over 1 cited inspection in that time.

Red Hook Const Group Inc: OSHA citation items per year, 2016 to 2018
Citation items per year, by inspection date.

New York · latest 90 days of OSHA records

362employers cited

9 of them in the same industry

Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New York

Checking a subcontractor, a client or your own company? Watch Red Hook Const Group Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343042909 OPENED MAR 26, 2018Closed

Follow-up · Partial · Safety · 1 employee at the site · Closed Mar 29, 2018

1210 2nd Ave, New York, NY 10065 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341987170 OPENED DEC 1, 2016Closed

Referral · Complete · Safety · 10 employees at the site · Closed Oct 16, 2024

1210 2nd Ave, New York, NY 10065 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.300(b)(1) · Tools—Hand and Power: general requirements
Serious$7,243$7,243May 25, 2017Final
Citation 1, item 2
29 CFR 1926.652(a)(1) · Trench protection
Serious$10,864$10,864May 25, 2017Final
Citation 1, item 3a
29 CFR 1926.703(a)(1) · Requirements for cast-in-place concrete
Serious$12,675$12,675May 25, 2017Final
Citation 1, item 3b
29 CFR 1926.703(a)(2) · Requirements for cast-in-place concrete
Serious$0$0May 25, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.300 · Tools—Hand and Power: general requirements

29 CFR 1926.300(b)(1)

(b) Guarding. (1) When power operated tools are designed to accommodate guards, they shall be equipped with such guards when in use.

29 CFR 1926.652 · Trench protection

29 CFR 1926.652(a)(1)

(a) Protection of employees in excavations. (1) Each employee in an excavation shall be protected from cave-ins by an adequate protective system designed in accordance with paragraph (b) or (c) of this section except when:

29 CFR 1926.703 · Requirements for cast-in-place concrete

29 CFR 1926.703(a)(1)

(a) General requirements for formwork. (1) Formwork shall be designed, fabricated, erected, supported, braced and maintained so that it will be capable of supporting without failure all vertical and lateral loads that may reasonably be anticipated to be applied to the formwork. Formwork which is designed, fabricated, erected, supported, braced and maintained in conformance with the appendix to this section will be deemed to meet the requirements of this paragraph.

Other site preparation contractors employers in New York

Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.