OSHA SearchOSHA records by employer

Rene Vierya dba Rene Vierya: OSHA inspections and violations

Crystal Lake, Illinois · Siding Contractors · NAICS 238170

1inspections
4citation items
$3,405current penalties
Jun 24, 2025last inspection

OSHA inspectors have visited Rene Vierya dba Rene Vierya in Illinois one time.

It opened on Jun 24, 2025 as a planned inspection, in Crystal Lake and is still open.

In all, OSHA issued 4 citation items: 4 serious.

The proposed penalties came to $6,810; today they stand at $3,405, 50% less.

The rule cited most here is 1926.454 (scaffold training), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Rene Vierya dba Rene Vierya averages $3,405 across 1 cited inspection.

Rene Vierya dba Rene Vierya: OSHA citation items per year, 2025 to 2025
Citation items per year, by inspection date.

Illinois · latest 90 days of OSHA records

416employers cited

7 of them in the same industry

Get notified the morning OSHA posts each new citation in Illinois: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Illinois

Checking a subcontractor, a client or your own company? Watch Rene Vierya dba Rene Vierya and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 348330952 OPENED JUN 24, 2025Open

Planned · Partial · Safety · 4 employees at the site · Open

684-694 Cassica Ct, Crystal Lake, IL 60012 · Siding Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(c)(2)(i) · Scaffolds, general requirements
Serious$3,972$1,986Sep 15, 2025Final
Citation 1, item 1b
29 CFR 1926.452(j)(2) · Rules for each type of scaffold
Serious$0$0Sep 15, 2025Final
Citation 1, item 2a
29 CFR 1926.454(a) · Scaffold training
Serious$2,838$1,419Sep 15, 2025Final
Citation 1, item 2b
29 CFR 1926.454(b) · Scaffold training
Serious$0$0Sep 15, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(c)(2)(i)

(i) Footings shall be level, sound, rigid, and capable of supporting the loaded scaffold without settling or displacement.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.452(j)(2)

(2) Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled.

29 CFR 1926.454 · Scaffold training

29 CFR 1926.454(a)

(a) The employer shall have each employee who performs work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards. The training shall include the following areas, as applicable:

Other siding contractors employers in Illinois

Alert subscribers get notified of each newly cited employer in Illinois the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.