OSHA SearchOSHA records by employer

Rick Mooney Construction, Inc: OSHA inspections and violations

Fort Smith, Arkansas · Commercial and Institutional Building Construction · NAICS 236220

1inspections
2citation items
$2,218current penalties
Jul 11, 2018last inspection

OSHA has inspected Rick Mooney Construction, Inc once in Arkansas.

The inspection began on Jul 11, 2018 as a planned inspection, in Fort Smith.

That inspection ended with 2 citation items: 2 serious.

Penalties were first proposed at $3,696 and now stand at $2,218, 40% lower after settlements or reviews.

Fall protection in construction comes up most often in these citations: 2 items under 1926.501.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Rick Mooney Construction, Inc averages $2,218 (1 cited inspection).

It reported 1 severe injury to OSHA since 2015.

Rick Mooney Construction, Inc: OSHA citation items per year, 2018 to 2018
Citation items per year, by inspection date.

Arkansas · latest 90 days of OSHA records

17employers cited

Get notified the morning OSHA posts each new citation in Arkansas: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Arkansas

Checking a subcontractor, a client or your own company? Watch Rick Mooney Construction, Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343294898 OPENED JUL 11, 2018Closed

Planned · Partial · Safety · 2 employees at the site · Closed Nov 15, 2018

7811 Euper Lane, Fort Smith, AR 72903 · Commercial and Institutional Building Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.501(b)(1) · Fall protection in construction
Serious$3,696$2,218Oct 31, 2018Final
Citation 1, item 1b
29 CFR 1926.501(b)(10) · Fall protection in construction
Serious$0$0Oct 31, 2018Final

Severe injury reports

Employers must report any work-related amputation, in-patient hospitalization or loss of an eye to OSHA within 24 hours. 1 report on file.

Mar 25, 2022, Fort Smith: Hospitalization · fractures · upper and lower limb(s)

An employee was making his way down off a roof he had just inspected. He lost his balance and slid off the edge of the roof, landing 16 to 18 feet below and suffering fractures to both legs and the left arm, as well as hip injuries. He was hospitalized.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.501(b)(1)

(b)(1) Unprotected sides and edges. Each employee on a walking/working surface (horizontal and vertical surface) with an unprotected side or edge which is 6 feet (1.8 m) or more above a lower level shall be protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems.

29 CFR 1926.501(b)(10)

(10) Roofing work on Low-slope roofs. Except as otherwise provided in paragraph (b) of this section, each employee engaged in roofing activities on low-slope roofs, with unprotected sides and edges 6 feet (1.8 m) or more above lower levels shall be protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system. Or, on roofs 50-feet (15.25 m) or less in width (see appendix A to subpart M of this part), the use of a safety monitoring system alone [i.e. without the warning line system] is permitted.

Other commercial and institutional building construction employers in Arkansas

Alert subscribers get notified of each newly cited employer in Arkansas the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.