Braintree, Massachusetts · Framing Contractors · NAICS 238130

1inspections
4citation items
$3,235current penalties
Mar 12, 2025last inspection

OSHA has inspected RM Construction, Inc. once in Massachusetts.

The inspection began on Mar 12, 2025, in Braintree; the case is still open.

That inspection ended with 4 citation items: 2 serious and 2 other-than-serious.

Penalties were first proposed at $3,235 and still stand at $3,235.

Proving cited hazards were fixed comes up most often in these citations: 2 items under 1903.19.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,079, and RM Construction, Inc. averages $3,235 (1 cited inspection).

RM Construction, Inc.: OSHA citation items per year, 2025 to 2025
Citation items per year, by inspection date.

Want to know if OSHA cites RM Construction, Inc. again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 348101445 OPENED MAR 12, 2025Open

Unprogrammed other · Partial · Safety · 3 employees at the site · Open

28 Andersen Road, Braintree, MA 02184 · Framing Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$2,837$2,837Mar 14, 2025Final
Citation 1, item 1b
29 CFR 1926.503(a)(1) · Fall protection training in construction
Serious$0$0Mar 14, 2025Final
Citation 2, item 1a
29 CFR 1903.19(c)(1) · Proving cited hazards were fixed
Other-than-serious$398$398May 28, 2025Final
Citation 2, item 1b
29 CFR 1903.19(d)(1) · Proving cited hazards were fixed
Other-than-serious$0$0May 28, 2025Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1903.19 · Proving cited hazards were fixed

29 CFR 1903.19(c)(1)

(c) Abatement certification. (1) Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section.

29 CFR 1903.19(d)(1)

(d) Abatement documentation. (1) The employer must submit to the Agency, along with the information on abatement certification required by paragraph (c)(3) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required.

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.501(b)(13)

(13) Residential construction. Each employee engaged in residential construction activities 6 feet (1.8 m) or more above lower levels shall be protected by guardrail systems, safety net system, or personal fall arrest system unless another provision in paragraph (b) of this section provides for an alternative fall protection measure. Exception: When the employer can demonstrate that it is infeasible or creates a greater hazard to use these systems, the employer shall develop and implement a fall protection plan which meets the requirements of paragraph (k) of § 1926.502.

29 CFR 1926.503 · Fall protection training in construction

Other framing contractors employers in Massachusetts

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.