OSHA SearchOSHA records by employer

RM Plastering, LLC: OSHA inspections and violations

Cumberland, Rhode Island · Drywall and Insulation Contractors · NAICS 238310

1inspections
4citation items
$5,363current penalties
Aug 14, 2025last inspection

OSHA inspectors have visited RM Plastering, LLC in Rhode Island one time.

It opened on Aug 14, 2025 on a referral, in Cumberland and is still open.

In all, OSHA issued 4 citation items: 2 serious and 2 other-than-serious.

The penalties, $5,363 in total, stand where OSHA first set them.

The rule cited most here is 1926.451 (scaffolds, general requirements), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,079 penalty. RM Plastering, LLC averages $5,363 across 1 cited inspection.

RM Plastering, LLC: OSHA citation items per year, 2025 to 2025
Citation items per year, by inspection date.

Want to know if OSHA cites RM Plastering, LLC again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 348431487 OPENED AUG 14, 2025Open

Referral · Partial · Safety · 2 employees at the site · Open

1404 Hunting Hill Road, Cumberland, RI 02864 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(a)(1) · Scaffolds, general requirements
Serious$4,965$4,965Dec 2, 2025Final
Citation 1, item 1b
29 CFR 1926.451(a)(6) · Scaffolds, general requirements
Serious$0$0Dec 2, 2025Final
Citation 2, item 1a
29 CFR 1903.19(c)(1) · Proving cited hazards were fixed
Other-than-serious$398$398May 18, 2026Final
Citation 2, item 1b
29 CFR 1903.19(d)(1) · Proving cited hazards were fixed
Other-than-serious$0$0May 18, 2026Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1903.19 · Proving cited hazards were fixed

29 CFR 1903.19(c)(1)

(c) Abatement certification. (1) Within 10 calendar days after the abatement date, the employer must certify to OSHA (the Agency) that each cited violation has been abated, except as provided in paragraph (c)(2) of this section.

29 CFR 1903.19(d)(1)

(d) Abatement documentation. (1) The employer must submit to the Agency, along with the information on abatement certification required by paragraph (c)(3) of this section, documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(a)(1)

(a) Capacity. (1) Except as provided in paragraphs (a)(2), (a)(3), (a)(4), (a)(5) and (g) of this section, each scaffold and scaffold component shall be capable of supporting, without failure, its own weight and at least 4 times the maximum intended load applied or transmitted to it.

Other drywall and insulation contractors employers in Rhode Island

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.