OSHA SearchOSHA records by employer

Rock Hard Granite III LLC: OSHA inspections and violations

Bend, Oregon · Cut Stone and Stone Product Manufacturing · NAICS 327991

2inspections
5citation items
$100current penalties
Jan 23, 2017last inspection

OSHA has inspected Rock Hard Granite III LLC 2 times in Oregon since 2016.

The latest one began on Jan 23, 2017 after a complaint, in Bend.

Those inspections ended with 5 citation items: 1 serious and 4 other-than-serious.

Penalties were first proposed at $100 and still stand at $100.

How that compares: the median penalty per cited inspection for manufacturing employers since 2015 is $4,500, and Rock Hard Granite III LLC averages $50 (2 cited inspections).

Rock Hard Granite III LLC: OSHA citation items per year, 2016 to 2017
Citation items per year, by inspection date.

Oregon · latest 90 days of OSHA records

397employers cited

Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oregon

Checking a subcontractor, a client or your own company? Watch Rock Hard Granite III LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 342049533 OPENED JAN 23, 2017Closed

Complaint · Partial · Safety · 5 employees at the site · Closed Jan 8, 2018

63595 Hunnell Rd Ste 120, Bend, OR 97703 · Cut Stone and Stone Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR OAR 437-001-0765(13)-1
Other-than-serious$0$0Feb 3, 2017Final

Inspection 341224244 OPENED FEB 1, 2016Closed

Planned · Complete · Safety · 8 employees at the site · Closed Jan 10, 2017

63595 Hunnell Rd Ste 120, Bend, OR 97701 · Cut Stone and Stone Product Manufacturing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.303(b)(1) · Electrical equipment, general requirements
Serious$100$100Feb 24, 2016Final
Citation 2, item 2
29 CFR 1910.305(b)(2)(i) · Electrical wiring methods
Other-than-serious$0$0Feb 24, 2016Final
Citation 2, item 3
29 CFR 1910.22(d)(1) · General requirements
Other-than-serious$0$0Feb 24, 2016Final
Citation 2, item 4
29 CFR OAR 437-001-0765(13)-1
Other-than-serious$0$0Feb 24, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.22 · General requirements

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.303(b)(1)

(b) Examination, installation, and use of equipment—(1) Examination. Electric equipment shall be free from recognized hazards that are likely to cause death or serious physical harm to employees. Safety of equipment shall be determined using the following considerations:

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.305(b)(2)(i)

(2) Covers and canopies. (i) All pull boxes, junction boxes, and fittings shall be provided with covers identified for the purpose. If metal covers are used, they shall be grounded. In completed installations, each outlet box shall have a cover, faceplate, or fixture canopy. Covers of outlet boxes having holes through which flexible cord pendants pass shall be provided with bushings designed for the purpose or shall have smooth, well-rounded surfaces on which the cords may bear.

Other cut stone and stone product manufacturing employers in Oregon

Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.