Inspection 345426878 OPENED JUL 20, 2021Closed
1525 Blackhawk Blvd, Mount Pleasant, UT 84647 · Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing · OSHA's record · Phone and website on Google Maps
| Citation and rule | Type | Proposed | Current | Issued | Status |
|---|---|---|---|---|---|
| Citation 1, item 1 29 CFR 1910.36(d)(1) · Exit route design |
Serious | $1,500 | $750 | Aug 17, 2021 | Final |
| Citation 1, item 2 29 CFR 1910.147(c)(1) · Lockout/tagout |
Serious | $1,500 | $750 | Aug 17, 2021 | Final |
| Citation 1, item 3 29 CFR 1910.212(a)(1) · Machine guarding |
Serious | $1,500 | $750 | Aug 17, 2021 | Final |
| Citation 1, item 4 29 CFR 1910.305(b)(2)(i) · Electrical wiring methods |
Serious | $1,500 | $750 | Aug 17, 2021 | Final |
| Citation 2, item 1 29 CFR UCA 34A-6-301(3)(B)(II) |
Other-than-serious | $500 | $250 | Aug 17, 2021 | Final |
| Citation 2, item 2 29 CFR UAC R614-1-5.B.2 |
Other-than-serious | $500 | $250 | Aug 17, 2021 | Final |
| Citation 2, item 3 29 CFR 1910.37(b)(2) · Exit routes |
Other-than-serious | $0 | $0 | Aug 17, 2021 | Final |
| Citation 2, item 4a 29 CFR 1910.303(g)(1)(i) · Electrical equipment, general requirements |
Other-than-serious | $0 | $0 | Aug 17, 2021 | Final |
| Citation 2, item 4b 29 CFR 1910.305(a)(2) · Electrical wiring methods |
Other-than-serious | $0 | $0 | Aug 17, 2021 | Final |
| Citation 2, item 4c 29 CFR 1910.305(g)(2)(ii) · Electrical wiring methods |
Other-than-serious | $0 | $0 | Aug 17, 2021 | Final |
| Citation 2, item 4d 29 CFR 1910.334(a)(1) · Using electrical equipment |
Other-than-serious | $0 | $0 | Aug 17, 2021 | Final |