OSHA SearchOSHA records by employer

Rogelio Vera: OSHA inspections and violations

Mcallen, Texas · Masonry Contractors · NAICS 238140

2inspections
6citation items
$20,578current penalties
Oct 8, 2020last inspection

Since 2017, OSHA inspectors have visited Rogelio Vera in Texas 2 times.

The most recent inspection opened on Oct 8, 2020 as part of a related case, in Portland.

In all, OSHA issued 6 citation items: 6 serious.

The penalties, $20,578 in total, stand where OSHA first set them.

The rule cited most here is 1926.451 (scaffolds, general requirements), 6 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,079 penalty. Rogelio Vera averages $10,289 across 2 cited inspections.

Rogelio Vera: OSHA citation items per year, 2017 to 2020
Citation items per year, by inspection date.

Want to know if OSHA cites Rogelio Vera again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 344966874 OPENED OCT 8, 2020Closed

Programmed related · Partial · Safety · 30 employees at the site · Closed Apr 15, 2024

2413 Memorial Pkwy, Portland, TX 78374 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$4,642$4,642Jan 28, 2021Final

Inspection 342430204 OPENED JUN 27, 2017Closed

Planned · Partial · Safety · 20 employees at the site · Closed Sep 13, 2023

3908 N. Mccoll, Mcallen, TX 78504 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$3,622$3,622Nov 9, 2017Final
Citation 1, item 2
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$3,622$3,622Nov 9, 2017Final
Citation 1, item 3a
29 CFR 1926.451(g)(1)(vi) · Scaffolds, general requirements
Serious$5,070$5,070Nov 9, 2017Final
Citation 1, item 3b
29 CFR 1926.451(g)(4)(i) · Scaffolds, general requirements
Serious$0$0Nov 9, 2017Final
Citation 1, item 4
29 CFR 1926.451(h)(2)(ii) · Scaffolds, general requirements
Serious$3,622$3,622Nov 9, 2017Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(e)(1)

(1) When scaffold platforms are more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface shall be used. Crossbraces shall not be used as a means of access.

29 CFR 1926.451(g)(1)(vi)

(vi) Each employee performing overhand bricklaying operations from a supported scaffold shall be protected from falling from all open sides and ends of the scaffold (except at the side next to the wall being laid) by the use of a personal fall arrest system or guardrail system (with minimum 200 pound toprail capacity).

Other masonry contractors employers in Texas

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.