OSHA SearchOSHA records by employer

RT Construction, LLC: OSHA inspections and violations

New Rochelle, New York · Finish Carpentry Contractors · NAICS 238350

1inspections
3citation items
$5,000current penalties
Jul 11, 2022last inspection

OSHA inspectors have visited RT Construction, LLC in New York one time.

It opened on Jul 11, 2022, in New Rochelle.

In all, OSHA issued 3 citation items: 3 serious.

The proposed penalties came to $8,081; today they stand at $5,000, 38% less.

Among construction employers, the typical cited inspection since 2015 ends with a $3,078 penalty. RT Construction, LLC averages $5,000 across 1 cited inspection.

RT Construction, LLC: OSHA citation items per year, 2022 to 2022
Citation items per year, by inspection date.

Want to know if OSHA cites RT Construction, LLC again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 346069503 OPENED JUL 11, 2022Closed

Unprogrammed other · Complete · Safety · 2 employees at the site · Closed Feb 10, 2025

26 South Division St., New Rochelle, NY 10805 · Finish Carpentry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.304(i)(1) · Woodworking tools
Serious$3,108$1,920Jul 12, 2022Final
Citation 1, item 2
29 CFR 1926.404(b)(1)(i) · Ground-fault protection on job sites
Serious$3,108$1,920Jul 12, 2022Final
Citation 1, item 3
29 CFR 1926.405(g)(2)(iii) · Job-site wiring
Serious$1,865$1,160Jul 12, 2022Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.304 · Woodworking tools

29 CFR 1926.304(i)(1)

(i) Hand-fed ripsaws. (1) Each circular hand-fed ripsaw shall be guarded by a hood which shall completely enclose that portion of the saw above the table and that portion of the saw above the material being cut. The hood and mounting shall be arranged so that the hood will automatically adjust itself to the thickness of and remain in contact with the material being cut but it shall not offer any considerable resistance to insertion of material to saw or to passage of the material being sawed. The hood shall be made of adequate strength to resist blows and strains incidental to reasonable operation, adjusting, and handling, and shall be so designed as to protect the operator from flying splinters and broken saw teeth. It shall be made of material that is soft enough so that it will be unlikely to cause tooth breakage. The hood shall be so mounted as to insure that its operation will be po

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(b)(1)(i)

(b) Branch circuits—(1) Ground-fault protection—(i) General. The employer shall use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites. These requirements are in addition to any other requirements for equipment grounding conductors.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(g)(2)(iii)

(iii) Splices. Flexible cords shall be used only in continuous lengths without splice or tap. Hard service flexible cords No. 12 or larger may be repaired if spliced so that the splice retains the insulation, outer sheath properties, and usage characteristics of the cord being spliced.

Other finish carpentry contractors employers in New York

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.