1inspections
3citation items
$5,400current penalties
Oct 17, 2018last inspection

OSHA has inspected Russell Mill Remodeling, LLC once in Massachusetts.

The inspection began on Oct 17, 2018 on a referral, in Plymouth.

That inspection ended with 3 citation items: 3 serious.

Penalties were first proposed at $10,532 and now stand at $5,400, 49% lower after settlements or reviews.

Scaffolds, general requirements comes up most often in these citations: 2 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,080, and Russell Mill Remodeling, LLC averages $5,400 (1 cited inspection).

Russell Mill Remodeling, LLC: OSHA citation items per year, 2018 to 2018
Citation items per year, by inspection date.

Massachusetts · latest 90 days of OSHA records

260employers cited

5 of them in the same industry

Get notified the morning OSHA posts each new citation in Massachusetts: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Massachusetts

Checking a subcontractor, a client or your own company? Watch Russell Mill Remodeling, LLC and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343549481 OPENED OCT 17, 2018Closed

Referral · Partial · Safety · 4 employees at the site · Closed Jun 10, 2019

243 Water Street, Plymouth, MA 02360 · Residential Remodelers · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.451(f)(6) · Scaffolds, general requirements
Serious$3,880$2,700Nov 21, 2018Final
Citation 1, item 2a
29 CFR 1926.451(f)(7) · Scaffolds, general requirements
Serious$3,880$2,700Nov 21, 2018Final
Citation 1, item 2b
29 CFR 1926.452(j)(2) · Rules for each type of scaffold
Serious$2,772$0Nov 21, 2018Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(f)(6)

(6) The clearance between scaffolds and power lines shall be as follows: Scaffolds shall not be erected, used, dismantled, altered, or moved such that they or any conductive material handled on them might come closer to exposed and energized power lines than as follows:

29 CFR 1926.451(f)(7)

(7) Scaffolds shall be erected, moved, dismantled, or altered only under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration. Such activities shall be performed only by experienced and trained employees selected for such work by the competent person.

29 CFR 1926.452 · Rules for each type of scaffold

29 CFR 1926.452(j)(2)

(2) Poles shall be secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. When the pump jack has to pass bracing already installed, an additional brace shall be installed approximately 4 feet (1.2 m) above the brace to be passed, and shall be left in place until the pump jack has been moved and the original brace reinstalled.

Other residential remodelers employers in Massachusetts

Alert subscribers get notified of each newly cited employer in Massachusetts the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.