OSHA SearchOSHA records by employer

Salmon Bay Barge Line: OSHA inspections and violations

Portland, Oregon · Marine Cargo Handling · NAICS 488320

3inspections
7citation items
$10,209current penalties
Aug 28, 2020last inspection

OSHA has inspected Salmon Bay Barge Line 3 times in Oregon since 2012.

The latest one began on Aug 28, 2020 as a planned inspection, in Portland.

Those inspections ended with 7 citation items: 5 serious and 2 other-than-serious.

Penalties were first proposed at $10,209 and still stand at $10,209.

Electrical wiring methods comes up most often in these citations: 3 items under 1910.305.

How that compares: the median penalty per cited inspection for transportation and warehousing employers since 2015 is $2,416, and Salmon Bay Barge Line averages $7,209 (1 cited inspection).

1 inspection on this page followed a fatal incident.

Salmon Bay Barge Line: OSHA citation items per year, 2012 to 2020
Citation items per year, by inspection date.

Oregon · latest 90 days of OSHA records

396employers cited

Get notified the morning OSHA posts each new citation in Oregon: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Oregon

Checking a subcontractor, a client or your own company? Watch Salmon Bay Barge Line and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344903570 OPENED AUG 28, 2020Closed

Planned · Complete · Safety · 3 employees at the site · Closed Feb 2, 2022

Berth 311, Swan Island Lagoon, Portland, OR 97217 · Ship Building and Repairing · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1910.305(a)(2)(i) · Electrical wiring methods
Serious$3,932$3,932Nov 4, 2020Final
Citation 1, item 1b
29 CFR 1910.305(b)(1)(ii) · Electrical wiring methods
Serious$0$0Nov 4, 2020Final
Citation 1, item 1c
29 CFR 1910.305(d)(2) · Electrical wiring methods
Serious$0$0Nov 4, 2020Final
Citation 1, item 2
29 CFR 1915.73(b) · Guarding of deck openings and edges
Serious$3,277$3,277Nov 4, 2020Final

Inspection 331918839 OPENED FEB 21, 2012Closed

Referral · Partial · Health · 2 employees at the site · Closed Apr 27, 2012

5949 N Basin Ave, Portland, OR 97217 · Marine Cargo Handling · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 331917799 OPENED FEB 19, 2012Closed

Fatality or catastrophe · Partial · Safety · 3 employees at the site · Closed Jun 14, 2012

5949 N Basin Ave, Portland, OR 97217 · Marine Cargo Handling · OSHA's record · Phone and website on Google Maps

Incident on Feb 19, 2012 (fatal): Employee drowns while conducting viscosity test

At 10:00 a.m. on February 19, 2012, Employee #1 was collecting samples of road binder liquid to test its viscosity. The bucket Employee #1 was using to collect the liquid disconnected from the haul line and Employee #1 fell into the hold through the hatch. Employee #1 was killed by drowning.

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1918.93(d)(4) · Hazardous atmospheres and substances (See also § 1918.2)
Serious$3,000$3,000May 16, 2012Final
Citation 2, item 1
29 CFR 1918.97(b) · First aid and lifesaving facilities. (See appendix V of this part)
Other-than-serious$0$0May 16, 2012Final
Citation 2, item 2
29 CFR 1918.97(d)(1) · First aid and lifesaving facilities. (See appendix V of this part)
Other-than-serious$0$0May 16, 2012Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.305 · Electrical wiring methods

29 CFR 1910.305(a)(2)(i)

(i) Temporary electrical power and lighting installations of 600 volts, nominal, or less may be used only as follows:

29 CFR 1910.305(b)(1)(ii)

(ii) Unused openings in cabinets, boxes, and fittings shall be effectively closed.

29 CFR 1910.305(d)(2)

(2) Panelboard enclosures. Panelboards shall be mounted in cabinets, cutout boxes, or enclosures designed for the purpose and shall be dead front. However, panelboards other than the dead front externally-operable type are permitted where accessible only to qualified persons.

29 CFR 1915.73 · Guarding of deck openings and edges

29 CFR 1918.93 · Hazardous atmospheres and substances (See also § 1918.2)

29 CFR 1918.97 · First aid and lifesaving facilities. (See appendix V of this part)

Other marine cargo handling employers in Oregon

Alert subscribers get notified of each newly cited employer in Oregon the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.