OSHA SearchOSHA records by employer

Sanher Stucco - Lather, Inc.: OSHA inspections and violations

Charlotte, North Carolina · Masonry Contractors · NAICS 238140

2inspections
9citation items
$10,941current penalties
Mar 2, 2021last inspection

Since 2019, OSHA inspectors have visited Sanher Stucco - Lather, Inc. in North Carolina 2 times.

The most recent inspection opened on Mar 2, 2021 as a planned inspection, in Winston Salem.

In all, OSHA issued 9 citation items: 9 serious.

The proposed penalties came to $13,300; today they stand at $10,941, 18% less.

The rule cited most here is 1926.451 (scaffolds, general requirements), 6 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Sanher Stucco - Lather, Inc. averages $5,470 across 2 cited inspections.

Sanher Stucco - Lather, Inc.: OSHA citation items per year, 2019 to 2021
Citation items per year, by inspection date.

North Carolina · latest 90 days of OSHA records

226employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in North Carolina: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in North Carolina

Checking a subcontractor, a client or your own company? Watch Sanher Stucco - Lather, Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345174643 OPENED MAR 2, 2021Closed

Planned · Complete · Safety · 2 employees at the site · Closed Jan 27, 2023

5408 - 5414 University Parkway, Winston Salem, NC 27105 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.453(b)(2)(v) · Aerial lifts
Serious$2,800$2,016Apr 1, 2021Final

Inspection 344430418 OPENED NOV 5, 2019Closed

Planned · Complete · Health · 6 employees at the site · Closed Aug 20, 2021

2212 Queens Road East, Charlotte, NC 28207 · Masonry Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(c)(1)(ii) · Scaffolds, general requirements
Serious$2,100$1,785Jan 13, 2020Final
Citation 1, item 1b
29 CFR 1926.451(c)(2)(ii) · Scaffolds, general requirements
Serious$0$0Jan 13, 2020Final
Citation 1, item 2
29 CFR 1926.451(e)(1) · Scaffolds, general requirements
Serious$2,100$1,785Jan 13, 2020Final
Citation 1, item 3a
29 CFR 1926.451(f)(3) · Scaffolds, general requirements
Serious$2,100$1,785Jan 13, 2020Final
Citation 1, item 3b
29 CFR 1926.454(b) · Scaffold training
Serious$0$0Jan 13, 2020Final
Citation 1, item 4a
29 CFR 1926.451(g)(1) · Scaffolds, general requirements
Serious$2,100$1,785Jan 13, 2020Final
Citation 1, item 4b
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$0$0Jan 13, 2020Final
Citation 1, item 5
29 CFR 1926.503(b)(1) · Fall protection training in construction
Serious$2,100$1,785Jan 13, 2020Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(c)(1)(ii)

(ii) Guys, ties, and braces shall be installed according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height and be repeated vertically at locations of horizontal members every 20 feet (6.1 m) or less thereafter for scaffolds 3 feet (0.91 m) wide or less, and every 26 feet (7.9 m) or less thereafter for scaffolds greater than 3 feet (0.91 m) wide. The top guy, tie or brace of completed scaffolds shall be placed no further than the 4:1 height from the top. Such guys, ties and braces shall be installed at each end of the scaffold and at horizontal intervals not to exceed 30 feet (9.1 m) (measured from one end [not both] towards the other).

29 CFR 1926.451(c)(2)(ii)

(ii) Unstable objects shall not be used to support scaffolds or platform units.

29 CFR 1926.453 · Aerial lifts

29 CFR 1926.454 · Scaffold training

29 CFR 1926.503 · Fall protection training in construction

Other masonry contractors employers in North Carolina

Alert subscribers get notified of each newly cited employer in North Carolina the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.