OSHA SearchOSHA records by employer

Savannah - Water Plant: OSHA inspections and violations

Savannah, Tennessee · Water Supply and Irrigation Systems · NAICS 221310

1inspections
11citation items
$0current penalties
Jul 30, 2018last inspection

OSHA has inspected Savannah - Water Plant once in Tennessee.

The inspection began on Jul 30, 2018 as a planned inspection, in Savannah.

That inspection ended with 11 citation items: 11 serious.

None of the citations carried a penalty.

Electrical equipment, general requirements comes up most often in these citations: 3 items under 1910.303.

How that compares: the median penalty per cited inspection for utility employers since 2015 is $0, and Savannah - Water Plant averages $0 (1 cited inspection).

Savannah - Water Plant: OSHA citation items per year, 2018 to 2018
Citation items per year, by inspection date.

Tennessee · latest 90 days of OSHA records

318employers cited

15 of them in the same industry

Get notified the morning OSHA posts each new citation in Tennessee: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Tennessee

Checking a subcontractor, a client or your own company? Watch Savannah - Water Plant and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 343344008 OPENED JUL 30, 2018Closed

Planned · Complete · Safety · Local government · 10 employees at the site · Closed Oct 19, 2018

655 Oak Street, Savannah, TN 38372 · Water Supply and Irrigation Systems · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1910.134(c)(1) · Respiratory protection
Serious$0$0Aug 20, 2018Final
Citation 1, item 2
29 CFR 1910.134(e)(1) · Respiratory protection
Serious$0$0Aug 20, 2018Final
Citation 1, item 3
29 CFR 1910.146(c)(2) · Permit-required confined spaces
Serious$0$0Aug 20, 2018Final
Citation 1, item 4
29 CFR 1910.147(c)(1) · Lockout/tagout
Serious$0$0Aug 20, 2018Final
Citation 1, item 5
29 CFR 1910.303(b)(2) · Electrical equipment, general requirements
Serious$0$0Aug 20, 2018Final
Citation 1, item 6
29 CFR 1910.303(g)(1)(ii) · Electrical equipment, general requirements
Serious$0$0Aug 20, 2018Final
Citation 1, item 7
29 CFR 1910.303(g)(2)(i)(d) · Electrical equipment, general requirements
Serious$0$0Aug 20, 2018Final
Citation 1, item 8
29 CFR 1910.305(g)(1)(iv)(d) · Electrical wiring methods
Serious$0$0Aug 20, 2018Final
Citation 1, item 9
29 CFR 1910.1030(c)(1) · Bloodborne pathogens
Serious$0$0Aug 20, 2018Final
Citation 1, item 10
29 CFR 1910.1200(e)(1) · Hazard communication
Serious$0$0Aug 20, 2018Final
Citation 1, item 11
29 CFR 1910.1200(f)(6)(ii) · Hazard communication
Serious$0$0Aug 20, 2018Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.1030 · Bloodborne pathogens

29 CFR 1910.1200 · Hazard communication

29 CFR 1910.1200(e)(1)

(e) Written hazard communication program. (1) Employers shall develop, implement, and maintain at each workplace, a written hazard communication program which at least describes how the criteria specified in paragraphs (f), (g), and (h) of this section for labels and other forms of warning, safety data sheets, and employee information and training will be met, and which also includes the following:

29 CFR 1910.1200(f)(6)(ii)

(ii) Product identifier and words, pictures, symbols, or combination thereof, which provide at least general information regarding the hazards of the chemicals, and which, in conjunction with the other information immediately available to employees under the hazard communication program, will provide employees with the specific information regarding the physical and health hazards of the hazardous chemical.

29 CFR 1910.134 · Respiratory protection

29 CFR 1910.134(c)(1)

(1) The test instrument must have an effective audio-warning device, or a visual-warning device in the form of a screen tracing, that indicates when the test subject fails to hold his or her breath during the test. The test must be terminated and restarted from the beginning when the test subject fails to hold his or her breath during the test. The test subject then may be refitted and retested.

29 CFR 1910.146 · Permit-required confined spaces

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

Other water supply and irrigation systems employers in Tennessee

Alert subscribers get notified of each newly cited employer in Tennessee the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.