OSHA SearchOSHA records by employer

Scalpel Construction, Inc: OSHA inspections and violations

New York, New York · Site Preparation Contractors · NAICS 238910

4inspections
9citation items
$20,900current penalties
Aug 31, 2016last inspection

Since 2016, OSHA inspectors have visited Scalpel Construction, Inc in New York 4 times.

The most recent inspection opened on Aug 31, 2016 to follow up on an earlier case, in New York.

In all, OSHA issued 9 citation items: 9 serious.

The penalties, $20,900 in total, stand where OSHA first set them.

The rule cited most here is 1926.405 (job-site wiring), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Scalpel Construction, Inc averages $6,967 across 3 cited inspections.

Scalpel Construction, Inc: OSHA citation items per year, 2016 to 2016
Citation items per year, by inspection date.

New York · latest 90 days of OSHA records

362employers cited

9 of them in the same industry

Get notified the morning OSHA posts each new citation in New York: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in New York

Checking a subcontractor, a client or your own company? Watch Scalpel Construction, Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 341750461 OPENED AUG 31, 2016Closed

Follow-up · Partial · Safety · 8 employees at the site · Closed Sep 15, 2016

159 Canal Street, New York, NY 10013 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 341496495 OPENED MAY 23, 2016Closed

Unprogrammed other · Complete · Health · 60 employees at the site · Closed Dec 22, 2016

255 East 138st, Bronx, NY 10451 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.50(g) · Medical services and first aid
Serious$2,800$2,800Jun 6, 2016Final

Inspection 341496651 OPENED MAY 23, 2016Closed

Unprogrammed other · Complete · Safety · 7 employees at the site · Closed Dec 5, 2019

255 East 138th St., Bronx, NY 10451 · Poured Concrete Foundation and Structure Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.501(b)(5) · Fall protection in construction
Serious$4,900$4,900Jul 22, 2016Final
Citation 1, item 2
29 CFR 1926.701(b) · Concrete and Masonry Construction: general requirements
Serious$2,800$2,800Jul 22, 2016Final

Inspection 341190494 OPENED JAN 14, 2016Closed

Unprogrammed other · Complete · Safety · 8 employees at the site · Closed Oct 9, 2019

159 Canal Street, New York, NY 10013 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.403(b)(1) · Electrical equipment on job sites
Serious$2,000$2,000Apr 1, 2016Final
Citation 1, item 2
29 CFR 1926.404(f)(6) · Ground-fault protection on job sites
Serious$2,000$2,000Apr 1, 2016Final
Citation 1, item 3
29 CFR 1926.405(g)(2)(iii) · Job-site wiring
Serious$2,000$2,000Apr 1, 2016Final
Citation 1, item 4
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Serious$2,000$2,000Apr 1, 2016Final
Citation 1, item 5
29 CFR 1926.601(b)(5) · Motor vehicles
Serious$1,200$1,200Apr 1, 2016Final
Citation 1, item 6
29 CFR 1926.1053(b)(4) · Ladders in construction
Serious$1,200$1,200Apr 1, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1053 · Ladders in construction

29 CFR 1926.1053(b)(4)

(4) Ladders shall be used only for the purpose for which they were designed.

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(b)(1)

(b) Examination, installation, and use of equipment—(1) Examination. The employer shall ensure that electrical equipment is free from recognized hazards that are likely to cause death or serious physical harm to employees. Safety of equipment shall be determined on the basis of the following considerations:

29 CFR 1926.404 · Ground-fault protection on job sites

29 CFR 1926.404(f)(6)

(6) Grounding path. The path to ground from circuits, equipment, and enclosures shall be permanent and continuous.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.50 · Medical services and first aid

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.601 · Motor vehicles

29 CFR 1926.701 · Concrete and Masonry Construction: general requirements

Other site preparation contractors employers in New York

Alert subscribers get notified of each newly cited employer in New York the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.