OSHA SearchOSHA records by employer

Schaefer Drywall and Painting: OSHA inspections and violations

Evansville, Indiana · Drywall and Insulation Contractors · NAICS 238310

1inspections
4citation items
$260current penalties
Mar 2, 2022last inspection

OSHA inspectors have visited Schaefer Drywall and Painting in Indiana one time.

It opened on Mar 2, 2022 as a planned inspection, in Evansville.

In all, OSHA issued 4 citation items: 4 serious.

The proposed penalties came to $400; today they stand at $260, 35% less.

The rule cited most here is 1926.1052 (stairways in construction), 2 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Schaefer Drywall and Painting averages $260 across 1 cited inspection.

Schaefer Drywall and Painting: OSHA citation items per year, 2022 to 2022
Citation items per year, by inspection date.

Indiana · latest 90 days of OSHA records

81employers cited

2 of them in the same industry

Get notified the morning OSHA posts each new citation in Indiana: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Indiana

Checking a subcontractor, a client or your own company? Watch Schaefer Drywall and Painting and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 345814024 OPENED MAR 2, 2022Closed

Planned · Complete · Safety · 2 employees at the site · Closed Apr 6, 2022

4315 Kenly Drive, Evansville, IN 47725 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.150(c)(1)(iv) · Fire protection
Serious$100$65Mar 7, 2022Final
Citation 1, item 2
29 CFR 1926.153(j) · Liquefied petroleum gas (LP-Gas)
Serious$100$65Mar 7, 2022Final
Citation 1, item 3
29 CFR 1926.1052(b)(3) · Stairways in construction
Serious$100$65Mar 7, 2022Final
Citation 1, item 4
29 CFR 1926.1052(c)(1)(i) · Stairways in construction
Serious$100$65Mar 7, 2022Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1052 · Stairways in construction

29 CFR 1926.1052(b)(3)

(3) Treads for temporary service shall be made of wood or other solid material, and shall be installed the full width and depth of the stair.

29 CFR 1926.1052(c)(1)(i)

(i) At least one handrail; and

29 CFR 1926.150 · Fire protection

29 CFR 1926.150(c)(1)(iv)

(iv) One or more fire extinguishers, rated not less than 2A, shall be provided on each floor. In multistory buildings, at least one fire extinguisher shall be located adjacent to stairway.

29 CFR 1926.153 · Liquefied petroleum gas (LP-Gas)

Other drywall and insulation contractors employers in Indiana

Alert subscribers get notified of each newly cited employer in Indiana the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.