OSHA SearchOSHA records by employer

Selvin Cabrera: OSHA inspections and violations

Brooklyn Park, Maryland · Drywall and Insulation Contractors · NAICS 238310

1inspections
5citation items
$1,050current penalties
May 25, 2016last inspection

OSHA has inspected Selvin Cabrera once in Maryland.

The inspection began on May 25, 2016 as a planned inspection, in Brooklyn Park; the case is still open.

That inspection ended with 5 citation items: 4 serious and 1 other-than-serious.

Penalties were first proposed at $1,050 and still stand at $1,050.

Scaffolds, general requirements comes up most often in these citations: 3 items under 1926.451.

How that compares: the median penalty per cited inspection for construction employers since 2015 is $3,079, and Selvin Cabrera averages $1,050 (1 cited inspection).

Selvin Cabrera: OSHA citation items per year, 2016 to 2016
Citation items per year, by inspection date.

Want to know if OSHA cites Selvin Cabrera again? Add it to a watchlist and we will email you the morning the citation shows up.

Watch this company

Inspection history

Inspection 341501971 OPENED MAY 25, 2016Open

Planned · Complete · Safety · 2 employees at the site · Open

5400 Ritchie Highway, Brooklyn Park, MD 21225 · Drywall and Insulation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.451(b)(1) · Scaffolds, general requirements
Serious$1,050$1,050Aug 2, 2016Final
Citation 1, item 1b
29 CFR 1926.451(f)(6) · Scaffolds, general requirements
Serious$0$0Aug 2, 2016Final
Citation 1, item 1c
29 CFR 1926.451(g)(1)(vii) · Scaffolds, general requirements
Serious$0$0Aug 2, 2016Final
Citation 1, item 1d
29 CFR 1926.454(a) · Scaffold training
Serious$0$0Aug 2, 2016Final
Citation 2, item 1
29 CFR 1926.405(g)(2)(iv) · Job-site wiring
Other-than-serious$0$0Aug 2, 2016Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.405 · Job-site wiring

29 CFR 1926.405(g)(2)(iv)

(iv) Strain relief. Flexible cords shall be connected to devices and fittings so that strain relief is provided which will prevent pull from being directly transmitted to joints or terminal screws.

29 CFR 1926.451 · Scaffolds, general requirements

29 CFR 1926.451(b)(1)

(b) Scaffold platform construction. (1) Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows:

29 CFR 1926.451(f)(6)

(6) The clearance between scaffolds and power lines shall be as follows: Scaffolds shall not be erected, used, dismantled, altered, or moved such that they or any conductive material handled on them might come closer to exposed and energized power lines than as follows:

29 CFR 1926.454 · Scaffold training

Other drywall and insulation contractors employers in Maryland