OSHA SearchOSHA records by employer

Sousa Design Architects Inc.: OSHA inspections and violations

Brookline, Massachusetts · Residential Remodelers · NAICS 236118

1inspections
5citation items
$4,000current penalties
Jan 7, 2020last inspection

Sousa Design Architects Inc. has one OSHA inspection on record in Massachusetts.

OSHA opened it on Jan 7, 2020 as part of a related case, in Brookline.

From that inspection OSHA issued 5 citation items: 5 serious.

OSHA proposed $17,927 in penalties. After settlements and reviews the total is $4,000, down 78%.

Most often, OSHA cited 1926.850, preparatory operations (2 items).

For context, across all construction employers the median penalty per cited inspection since 2015 is $3,080. Sousa Design Architects Inc. averages $4,000 over 1 cited inspection in that time.

Sousa Design Architects Inc.: OSHA citation items per year, 2020 to 2020
Citation items per year, by inspection date.

Massachusetts · latest 90 days of OSHA records

256employers cited

5 of them in the same industry

Get notified the morning OSHA posts each new citation in Massachusetts: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Massachusetts

Checking a subcontractor, a client or your own company? Watch Sousa Design Architects Inc. and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344545348 OPENED JAN 7, 2020Closed

Unprogrammed related · Partial · Safety · 6 employees at the site · Closed Mar 29, 2022

1762 Beacon Street, Brookline, MA 02445 · Residential Remodelers · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 1926.403(i)(2)(i) · Electrical equipment on job sites
Serious$4,048$2,000Apr 28, 2020Final
Citation 1, item 1b
29 CFR 1926.850(c) · Preparatory operations
Serious$1,735$0Apr 28, 2020Final
Citation 1, item 2a
29 CFR 1926.501(b)(13) · Fall protection in construction
Serious$4,048$2,000Apr 28, 2020Final
Citation 1, item 2b
29 CFR 1926.850(i) · Preparatory operations
Serious$4,048$0Apr 28, 2020Final
Citation 1, item 2c
29 CFR 1926.1052(c)(1)(i) · Stairways in construction
Serious$4,048$0Apr 28, 2020Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.1052 · Stairways in construction

29 CFR 1926.1052(c)(1)(i)

(i) At least one handrail; and

29 CFR 1926.403 · Electrical equipment on job sites

29 CFR 1926.403(i)(2)(i)

(2) Guarding of live parts. (i) Except as required or permitted elsewhere in this subpart, live parts of electric equipment operating at 50 volts or more shall be guarded against accidental contact by cabinets or other forms of enclosures, or by any of the following means:

29 CFR 1926.501 · Fall protection in construction

29 CFR 1926.501(b)(13)

(13) Residential construction. Each employee engaged in residential construction activities 6 feet (1.8 m) or more above lower levels shall be protected by guardrail systems, safety net system, or personal fall arrest system unless another provision in paragraph (b) of this section provides for an alternative fall protection measure. Exception: When the employer can demonstrate that it is infeasible or creates a greater hazard to use these systems, the employer shall develop and implement a fall protection plan which meets the requirements of paragraph (k) of § 1926.502.

29 CFR 1926.850 · Preparatory operations

Other residential remodelers employers in Massachusetts

Alert subscribers get notified of each newly cited employer in Massachusetts the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.