OSHA SearchOSHA records by employer

Sowers Construction, Inc: OSHA inspections and violations

Dublin, Virginia · Site Preparation Contractors · NAICS 238910

9inspections
10citation items
$18,191current penalties
Apr 29, 2020last inspection

Since 2004, OSHA inspectors have visited Sowers Construction, Inc in Virginia 9 times.

The most recent inspection opened on Apr 29, 2020 as a planned inspection, in Roanoke.

In all, OSHA issued 10 citation items: 6 serious, 1 repeat and 3 other-than-serious.

The proposed penalties came to $25,860; today they stand at $18,191, 30% less.

The rule cited most here is 1926.651 (excavations), 4 times.

Among construction employers, the typical cited inspection since 2015 ends with a $3,080 penalty. Sowers Construction, Inc averages $16,748 across 1 cited inspection.

Sowers Construction, Inc: OSHA citation items per year, 2004 to 2020
Citation items per year, by inspection date.

Virginia · latest 90 days of OSHA records

248employers cited

Get notified the morning OSHA posts each new citation in Virginia: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Virginia

Checking a subcontractor, a client or your own company? Watch Sowers Construction, Inc and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 344757133 OPENED APR 29, 2020Closed

Planned · Partial · Safety · 6 employees at the site · Closed Aug 24, 2020

Located Near 3521 Franklin Road Sw, Roanoke, VA 24014 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.50(c) · Medical services and first aid
Other-than-serious$2,600$0Jun 25, 2020Final
Citation 1, item 2
29 CFR 1926.651(c)(2) · Excavations
Serious$4,490$3,592Jun 25, 2020Final
Citation 1, item 3
29 CFR 1926.651(j)(2) · Excavations
Serious$4,960$3,968Jun 25, 2020Final
Citation 1, item 4
29 CFR 1926.651(k)(1) · Excavations
Serious$4,960$3,968Jun 25, 2020Final
Citation 1, item 5
29 CFR 1926.652(a)(1) · Trench protection
Serious$6,525$5,220Jun 25, 2020Final

Inspection 317725257 OPENED JUN 12, 2014Closed

Planned · No inspection · Safety · Closed Aug 13, 2014

Rt. 100 - Rt. 1030, Dublin, VA 24084 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 317755650 OPENED JUN 11, 2014Closed

Planned · Partial · Safety · 4 employees at the site · Closed Aug 13, 2014

I-77 Exit 19, Galax, VA 24333 · Highway, Street, and Bridge Construction · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 314620865 OPENED JUN 30, 2010Closed

Planned · Partial · Safety · 7 employees at the site · Closed Jul 30, 2010

Liberty St At Stultz Rd, Martinsville, VA 24112 · Other Heavy and Civil Engineering Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.453(b)(2)(v) · Aerial lifts
Serious$1,225$800Jul 15, 2010Closed
Citation 1, item 2
29 CFR 1926.502(b)(2) · Fall protection systems
Serious$980$523Jul 15, 2010Closed

Inspection 314312505 OPENED APR 22, 2010Closed

Planned · Partial · Safety · 9 employees at the site · Closed Aug 20, 2010

Hooper Field, Roanoke, VA 24022 · Water and Sewer Line and Related Structures Construction · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.651(j)(2) · Excavations
Other-than-serious$0$0May 27, 2010Closed

Inspection 313699704 OPENED AUG 11, 2009Closed

Planned · Complete · Safety · 3 employees at the site · Closed Aug 11, 2009

114 East Main Street, Fries, VA 24330 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

Inspection 310878541 OPENED FEB 12, 2007Closed

Planned · Partial · Safety · 7 employees at the site · Closed Apr 20, 2007

5225 Alexander Road, Dublin, VA 24084 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 1926.602(a)(9)(ii) · Earthmovers and forklifts in construction
Repeat$120$120Mar 8, 2007Closed

Inspection 310575162 OPENED OCT 30, 2006Closed

Planned · Complete · Safety · 10 employees at the site · Closed Jan 26, 2007

5225 Alexander Road, Dublin, VA 24084 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 2, item 1
29 CFR 1926.602(a)(9)(ii) · Earthmovers and forklifts in construction
Other-than-serious$0$0Dec 6, 2006Closed
1 older inspection

Inspection 308118173 OPENED SEP 10, 2004Closed

Planned · Partial · Health · 1 employee at the site · Closed Sep 10, 2004

Routes 58 And 52, Hillsville, VA 24343 · Site Preparation Contractors · OSHA's record · Phone and website on Google Maps

No citations from this inspection.

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1926.453 · Aerial lifts

29 CFR 1926.453(b)(2)(v)

(v) A body belt shall be worn and a lanyard attached to the boom or basket when working from an aerial lift.

29 CFR 1926.50 · Medical services and first aid

29 CFR 1926.50(c)

(c) In the absence of an infirmary, clinic, hospital, or physician, that is reasonably accessible in terms of time and distance to the worksite, which is available for the treatment of injured employees, a person who has a valid certificate in first-aid training from the U.S. Bureau of Mines, the American Red Cross, or equivalent training that can be verified by documentary evidence, shall be available at the worksite to render first aid.

29 CFR 1926.502 · Fall protection systems

29 CFR 1926.502(b)(2)

(2) Midrails, screens, mesh, intermediate vertical members, or equivalent intermediate structural members shall be installed between the top edge of the guardrail system and the walking/working surface when there is no wall or parapet wall at least 21 inches (53 cm) high.

29 CFR 1926.602 · Earthmovers and forklifts in construction

29 CFR 1926.651 · Excavations

29 CFR 1926.652 · Trench protection

Other site preparation contractors employers in Virginia

Alert subscribers get notified of each newly cited employer in Virginia the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.