OSHA SearchOSHA records by employer

Squires Industries Inc dba Petronis Industries: OSHA inspections and violations

Wixom, Michigan · Machine Shops · NAICS 332710

2inspections
18citation items
$4,900current penalties
Jul 14, 2026last inspection

Since 2023, OSHA inspectors have visited Squires Industries Inc dba Petronis Industries in Michigan 2 times.

The most recent inspection opened on Jul 14, 2026 as a planned inspection, in Wixom.

In all, OSHA issued 18 citation items: 9 serious, 1 repeat and 8 other-than-serious.

The proposed penalties came to $9,800; today they stand at $4,900, 50% less.

The rule cited most here is 1910.147 (lockout/tagout), 4 times.

Among manufacturing employers, the typical cited inspection since 2015 ends with a $3,600 penalty. Squires Industries Inc dba Petronis Industries averages $2,450 across 2 cited inspections.

Squires Industries Inc dba Petronis Industries: OSHA citation items per year, 2023 to 2026
Citation items per year, by inspection date.

Michigan · latest 90 days of OSHA records

617employers cited

12 of them in the same industry

Get notified the morning OSHA posts each new citation in Michigan: the employer, the site address, the rules broken and the penalty.

See who gets cited next

Latest cited in Michigan

Checking a subcontractor, a client or your own company? Watch Squires Industries Inc dba Petronis Industries and get notified the morning OSHA posts a new citation for it.

Watch this company

Inspection history

Inspection 349049783 OPENED JUL 14, 2026Closed

Planned · Complete · Safety · 18 employees at the site · Closed Sep 30, 2026

29181 Beck Road, Wixom, MI 48393 · Machine Shops · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1
29 CFR 408.10727(1)
Serious$2,000$1,000Sep 2, 2026Final
Citation 2, item 1
29 CFR 408.10121(1)
Repeat$2,400$1,200Sep 2, 2026Final
Citation 3, item 1
29 CFR 408.12131(1)
Other-than-serious$0$0Sep 2, 2026Final
Citation 3, item 2
29 CFR 408.12154(5)
Other-than-serious$0$0Sep 2, 2026Final
Citation 3, item 3
29 CFR 408.13312(2)
Other-than-serious$0$0Sep 2, 2026Final
Citation 3, item 4
29 CFR 1910.305(g)(2)(iii) · Electrical wiring methods
Other-than-serious$0$0Sep 2, 2026Final
Citation 3, item 5
29 CFR 1910.147(c)(6)(ii) · Lockout/tagout
Other-than-serious$0$0Sep 2, 2026Final

Inspection 346618788 OPENED APR 7, 2023Closed

Planned · Complete · Safety · 18 employees at the site · Closed Jun 13, 2023

29181 Beck Road, Wixom, MI 48393 · Machine Shops · OSHA's record · Phone and website on Google Maps

Citation and ruleTypeProposedCurrentIssuedStatus
Citation 1, item 1a
29 CFR 408.10187(1)
Serious$800$400May 5, 2023Final
Citation 1, item 1b
29 CFR 408.10121(1)
Serious$0$0May 5, 2023Final
Citation 1, item 2
29 CFR 408.12635(1)
Serious$800$400May 5, 2023Final
Citation 1, item 3
29 CFR 408.13312(1)
Serious$800$400May 5, 2023Final
Citation 1, item 4
29 CFR 1910.303(b)(1) · Electrical equipment, general requirements
Serious$2,000$1,000May 5, 2023Final
Citation 1, item 5a
29 CFR 1910.147(c)(4)(i) · Lockout/tagout
Serious$1,000$500May 5, 2023Final
Citation 1, item 5b
29 CFR 1910.147(c)(6)(i) · Lockout/tagout
Serious$0$0May 5, 2023Final
Citation 1, item 5c
29 CFR 1910.147(c)(7)(i) · Lockout/tagout
Serious$0$0May 5, 2023Final
Citation 2, item 1
29 CFR 408.10835(3)
Other-than-serious$0$0May 5, 2023Final
Citation 2, item 2a
29 CFR 408.12153(1)
Other-than-serious$0$0May 5, 2023Final
Citation 2, item 2b
29 CFR 408.12154(1)
Other-than-serious$0$0May 5, 2023Final

The rules behind these citations

Current text from the Code of Federal Regulations. Some citations were issued under older wording.

29 CFR 1910.147 · Lockout/tagout

29 CFR 1910.147(c)(4)(i)

(4) Energy control procedure. (i) Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section.

29 CFR 1910.147(c)(6)(i)

(6) Periodic inspection. (i) The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed.

29 CFR 1910.147(c)(6)(ii)

(ii) The employer shall certify that the periodic inspections have been performed. The certification shall identify the machine or equipment on which the energy control procedure was being utilized, the date of the inspection, the employees included in the inspection, and the person performing the inspection.

29 CFR 1910.303 · Electrical equipment, general requirements

29 CFR 1910.305 · Electrical wiring methods

Other machine shops employers in Michigan

Alert subscribers get notified of each newly cited employer in Michigan the morning it is posted. See the alert plans.

Source: U.S. Department of Labor, OSHA enforcement data. A citation is OSHA's allegation; employers can contest it, and the status column shows where each item stands. Something wrong on this page? Tell us.